Appearance
User Guide
Comprehensive documentation for common ErgoPlanner workflows and operations.
Overview
This User Guide covers the complete ErgoPlanner workflow from project creation through simulation execution and results analysis. Each guide provides step-by-step instructions with examples and best practices.
Quick Navigation
Project Setup
- Creating-Projects - Project creation, templates, and initial setup
- Building-Process-Diagrams - Drag-and-drop diagram building and connections
Simulation
- Running-Simulations - Steady-state simulation setup and execution
- Dynamic-Simulation - Time-varying simulations with dynamic inputs
AI Agents
- Agent-Chat - Ask the agents; replies stream in and can be stopped
Analysis and Export
- Analyzing-Results - Interpreting simulation results and charts
- Exporting-Data - PDF reports, CSV data, and JSON templates
Workflow Overview
The typical ErgoPlanner workflow follows these stages:
1. Create Project → 2. Build Diagram → 3. Configure Units → 4. Run Simulation → 5. Analyze Results → 6. Export DataStage 1: Project Creation
Start by creating a new project from scratch or using a template. Projects organize your work and store all configurations, diagrams, and results.
Time Required: 2-5 minutes See: Creating-Projects
Stage 2: Diagram Building
Build your process diagram by dragging units onto the canvas and connecting them with streams. The diagram represents the physical layout of your treatment plant.
Time Required: 10-30 minutes (depending on complexity) See: Building-Process-Diagrams
Stage 3: Configuration
Configure each process unit with operating parameters, influent characteristics, and biokinetic model settings.
Time Required: 15-45 minutes See: Running-Simulations (Configuration section)
Stage 4: Simulation
Run steady-state or dynamic simulations to calculate process performance, mass balances, and effluent quality.
Time Required: 30 seconds to 10 minutes See: Running-Simulations, Dynamic-Simulation
Stage 5: Analysis
Review results, check mass balances, verify effluent compliance, and identify optimization opportunities.
Time Required: 10-30 minutes See: Analyzing-Results
Stage 6: Export
Export results as PDF reports, CSV data for external analysis, or JSON templates for reuse.
Time Required: 2-5 minutes See: Exporting-Data
Guide Descriptions
Creating Projects
Learn how to create new projects, select and use templates, configure project properties, and manage project organization. Covers both starting from scratch and using pre-built templates.
Key Topics:
- New project wizard
- Template selection and customization
- Project properties and metadata
- Project organization and folders
- Importing existing projects
Difficulty: Beginner Estimated Time: 10 minutes
Building Process Diagrams
Master the drag-and-drop interface for creating process diagrams. Learn to add process units, create connections, organize layouts, and use the shapes library.
Key Topics:
- Process units library navigation
- Drag-and-drop unit placement
- Stream connections and routing
- Canvas navigation and zoom
- Alignment and layout tools
- Copy, paste, and duplicate
- Grouping and naming
Difficulty: Beginner to Intermediate Estimated Time: 20 minutes
Running Simulations
Complete guide to setting up and executing steady-state simulations. Covers solver selection, convergence settings, parameter configuration, and troubleshooting failed simulations.
Key Topics:
- Simulation type selection
- Solver configuration (Newton-Raphson, Successive Substitution)
- Convergence criteria and tolerance
- Initial guess strategies
- Monitoring simulation progress
- Convergence troubleshooting
- Saving simulation configurations
Difficulty: Intermediate Estimated Time: 30 minutes
Dynamic Simulation
Advanced guide for time-varying simulations. Learn to configure dynamic inputs, set simulation duration, use time-series data, and analyze temporal results.
Key Topics:
- Dynamic vs steady-state comparison
- Time-step selection
- Dynamic influent configuration
- Controller integration
- Time-series data import
- Temporal results visualization
- Event-based scenarios (storms, upsets)
Difficulty: Advanced Estimated Time: 45 minutes
Analyzing Results
Comprehensive guide to interpreting simulation results. Learn to read charts, verify mass balances, check effluent compliance, and identify process issues.
Key Topics:
- Results dashboard overview
- Effluent quality assessment
- Mass balance verification
- Unit performance metrics
- Chart and graph interpretation
- Comparing scenarios
- Identifying optimization opportunities
- Results filtering and search
Difficulty: Intermediate Estimated Time: 25 minutes
Exporting Data
Learn all export options including PDF reports, CSV data files, JSON templates, and integration with external tools.
Key Topics:
- PDF report generation and customization
- CSV data export for Excel/Python
- JSON template creation and sharing
- Export configurations and presets
- Batch export for multiple scenarios
- Integration with BI tools
- Automated reporting
Difficulty: Beginner to Intermediate Estimated Time: 20 minutes
Common Workflows
Workflow 1: Simple Plant Evaluation (30 min)
Evaluate treatment performance for a simple plant configuration.
- Creating-Projects - Create from "Basic AS" template (3 min)
- Running-Simulations - Configure and run steady-state (10 min)
- Analyzing-Results - Review effluent quality (10 min)
- Exporting-Data - Generate PDF report (5 min)
Workflow 2: Custom Plant Design (2 hours)
Design a new treatment plant from scratch.
- Creating-Projects - Create blank project (3 min)
- Building-Process-Diagrams - Build custom layout (45 min)
- Running-Simulations - Configure biokinetic models (30 min)
- Analyzing-Results - Optimize design (30 min)
- Exporting-Data - Document design (10 min)
Workflow 3: Storm Event Analysis (1 hour)
Analyze plant performance during wet weather.
- Creating-Projects - Start from existing project (2 min)
- Dynamic-Simulation - Configure storm hydrograph (20 min)
- Dynamic-Simulation - Run dynamic simulation (10 min)
- Analyzing-Results - Analyze temporal results (20 min)
- Exporting-Data - Export time-series data (5 min)
Workflow 4: Multi-Scenario Comparison (3 hours)
Compare multiple design alternatives or operating strategies.
- Creating-Projects - Create base project (5 min)
- Building-Process-Diagrams - Build base configuration (30 min)
- Running-Simulations - Run base case (10 min)
- Duplicate project for each scenario (15 min)
- Modify and run each scenario (60 min)
- Analyzing-Results - Compare all scenarios (45 min)
- Exporting-Data - Generate comparison report (15 min)
Tips for Efficient Use
Keyboard Shortcuts
Master keyboard shortcuts for faster workflow. See Keyboard-Shortcuts for complete reference.
Essential Shortcuts:
Ctrl+S- Save projectCtrl+R- Run simulationCtrl+Z/Ctrl+Y- Undo/RedoCtrl+C/Ctrl+V- Copy/Paste unitsDelete- Delete selected unitsCtrl+G- Toggle gridSpace+Drag- Pan canvas
Templates and Reuse
Create custom templates for frequently used configurations:
- Build and configure a project completely
- File → Save as Template
- Reuse the template for similar projects
Saves 30-60 minutes per project!
Batch Operations
When working with multiple scenarios:
- Use project duplication instead of recreating
- Configure export presets for consistent reporting
- Use JSON templates for bulk configuration changes
- Set up simulation configurations once, reuse across scenarios
Organization
Keep projects organized:
- Use clear, descriptive project names
- Add project descriptions and metadata
- Organize projects into folders by client/plant
- Tag projects for easy searching
- Archive completed projects
Skill Progression
Beginner (0-5 hours experience)
Focus on these guides:
- Creating-Projects
- Building-Process-Diagrams (basics)
- Running-Simulations (basic steady-state)
- Analyzing-Results (effluent quality only)
- Exporting-Data (PDF reports)
Goal: Successfully run a steady-state simulation and generate a report.
Intermediate (5-20 hours experience)
Expand to:
- Building-Process-Diagrams (advanced layouts)
- Running-Simulations (solver tuning)
- Analyzing-Results (full analysis)
- Exporting-Data (CSV, templates)
- Biokinetic-Models
- Controller-Setup
Goal: Design custom plant configurations and optimize performance.
Advanced (20+ hours experience)
Master all features:
Goal: Conduct comprehensive plant analysis with calibration and optimization.
Integration with Other Sections
Related Getting Started Guides
- Installation - Before using these workflows
- First-Simulation - Simplified walkthrough
- Interface-Overview - UI reference
- Keyboard-Shortcuts - Productivity boost
Related Tutorials
- Biokinetic-Models - Configure ASM models
- Controller-Setup - Automated process control
- Carbon-Footprint - Emissions analysis
- Multi-Scenario - Sensitivity analysis
Related Best Practices
- Model-Calibration - Match plant data
- Troubleshooting - Fix common issues
- Performance-Tips - Optimize large models
Support and Resources
Getting Help
If you're stuck on any workflow:
- Check Troubleshooting for common issues
- Search this wiki for specific topics
- Review relevant Tutorials for detailed examples
- Consult API-Reference for advanced integration
Providing Feedback
Help improve these guides:
- Report errors or unclear instructions
- Suggest additional workflows
- Request new examples
- Share your use cases
Summary
This User Guide section provides comprehensive workflow documentation for:
- 6 core workflows covering the complete ErgoPlanner process
- Step-by-step instructions with examples and screenshots
- Time estimates for planning your work
- Difficulty levels for self-paced learning
- Integration with tutorials and best practices
Estimated Time to Review All Guides: 2-3 hours
Recommended Approach: Read guides as-needed for specific tasks, not all at once.
Next Steps:
- New users: Start with Creating-Projects
- Need to build a diagram: Jump to Building-Process-Diagrams
- Ready to simulate: See Running-Simulations
- Have results: Go to Analyzing-Results
Last updated: December 2025User Guide Overview