Humus Tanks - PS221 Design Standards ​

Humus tanks (also called secondary settling tanks or final clarifiers in biofilter systems) capture sloughed biomass from biofilters. They provide final clarification before discharge or further treatment.

UK PS221 Standards ​

Design Criteria ​

ParameterPS221 LimitUnitsNotes
HLR (all tanks in service)≤ 1.0m³/m²/hHydraulic loading rate at FFT
HLR (N-1, one tank out)≤ 2.0m³/m²/hWith one tank OOS for maintenance
Minimum HRT≥ 2.0hoursAt maximum flow (FFT)
Minimum SWD≥ 2.0mSidewater depth
Minimum tanks2-For N-1 redundancy

Comparison with Primary Tanks (PS208) ​

ParameterPrimary (PS208)Humus (PS221)Reason for Difference
Max HLR1.2 m/h (DWF)1.0 m/h (FFT)Humus sludge settles slower than primary
Min HRT2 hours2 hoursSame settling time requirement
Min SWD2.5 m2.0 mHumus tanks can be shallower
Sludge %DS3-5%1-2%Humus sludge is lighter, less dense

Design Equations ​

Geometry Calculations ​

Radial (Circular) Tanks ​

Surface area:

A = π × (D/2)²

Where:

  • A = surface area (m²)
  • D = diameter (m)
  • Typical: 12-25 m diameter

Volume:

V_cylindrical = A × SWD
V_conical = (1/3) × π × r² × h_cone
V_total = V_cylindrical + V_conical

Where:

  • SWD = sidewater depth (m), typically 2.0-3.0 m
  • h_cone = conical hopper depth (m), typically 0.5-1.5 m

Rectangular Tanks ​

Surface area:

A = L × W

Volume:

V = L × W × SWD

Where:

  • L = length (m), typical 15-40 m
  • W = width (m), typical 4-10 m
  • L:W ratio: 3:1 to 5:1

Hydraulic Calculations ​

Hydraulic Loading Rate (HLR) ​

Formula:

HLR = Q / A / 24

Where:

  • HLR = hydraulic loading rate (m³/m²/h)
  • Q = flow rate (m³/d)
  • A = surface area (m²)

PS221 limits:

  • All tanks in service: ≤ 1.0 m³/m²/h at FFT
  • N-1 (one tank out): ≤ 2.0 m³/m²/h at FFT

Design notes:

  • Check HLR at DWF, ADF, and FFT
  • FFT typically controls design
  • N-1 condition must be verified

Hydraulic Retention Time (HRT) ​

Formula:

HRT = (V / Q) × 24

Where:

  • HRT = hydraulic retention time (hours)
  • V = liquid volume above SWD (m³)
  • Q = flow rate (m³/d)

PS221 minimum: 2 hours at FFT

Typical values:

  • At DWF: 6-12 hours
  • At ADF: 4-8 hours
  • At FFT: 2-4 hours

Settling Velocity Considerations ​

Humus sludge has lower density and slower settling than primary sludge.

Typical Settling Velocities ​

Sludge TypeSettling VelocityDensityNotes
Primary sludge1.5-3.0 m/h1.02-1.05Coarse, dense solids
Humus sludge0.5-1.5 m/h1.005-1.02Light biological floc
WAS (activated sludge)0.8-2.0 m/h1.003-1.01Flocculated biomass

Design implications:

  • Lower HLR limit (1.0 vs 1.2 m/h) accounts for slower settling
  • Longer retention time aids flocculation
  • Gentle flow regime prevents floc breakup

Upward Velocity vs Settling Velocity ​

For effective capture:

V_upward < 0.7 × V_settling (safety factor)

PS221 HLR of 1.0 m/h provides adequate safety margin:

V_upward = 1.0 m/h
V_settling = 1.5 m/h (typical humus)
Safety factor = 1.0 / 1.5 = 0.67 ✓

N-1 Compliance ​

With one tank out of service:

Required area calculation:

A_required = Q_FFT / HLR_max / 24
A_provided = n × A_single
A_N-1 = (n-1) × A_single

For compliance: A_N-1 ≥ A_required (at HLR = 2.0 m/h)

Design approach: For 2 tanks (minimum):

  • Each tank must handle FFT/2 at ≤ 1.0 m/h (both in service)
  • Single tank must handle FFT at ≤ 2.0 m/h (N-1 condition)

Example:

FFT = 1,800 m³/d

All tanks in service (n=2):
A_required = 1800 / 1.0 / 24 = 75 m² per tank minimum
A_total = 150 m²

N-1 (one tank out):
A_single = 75 m²
HLR_N-1 = 1800 / 75 / 24 = 1.0 m/h ✓ (< 2.0 m/h limit)

Humus Sludge Capture ​

Capture Efficiency ​

Typical humus sludge capture:

Capture_efficiency = 85%

This means 85% of biofilter biomass production is captured; 15% passes to effluent as dispersed solids.

Humus Sludge Production ​

Formula:

Sludge_solids = Biomass_biofilter × (E_capture / 100)
Sludge_flow = Sludge_solids / (DS% × 10)

Where:

  • Biomass_biofilter = biofilter biomass production (kgSS/d)
  • E_capture = capture efficiency (%, typically 85%)
  • DS% = humus sludge dry solids (%, typically 2%)

Humus sludge characteristics:

  • Dry solids: 1.5-2.5% (typically 2%)
  • Volatile solids: 70-80% of DS
  • Specific gravity: 1.005-1.015
  • Color: Brown (aerobic) or grey-black (partly anaerobic)

Example:

Biofilter biomass = 100 kgSS/d
Capture = 85%
DS = 2%

Sludge_solids = 100 × 0.85 = 85 kgSS/d
Sludge_flow = 85 / (2 × 10) = 4.25 m³/d

Worked Example ​

Design Basis ​

  • FFT: 1,800 m³/d
  • DWF: 600 m³/d
  • ADF: 960 m³/d (DWF × 1.6)
  • Biofilter biomass production: 48 kgSS/d

Step 1: Size for HLR Compliance ​

All tanks in service (at FFT):

A_required = Q_FFT / HLR_max / 24
A_required = 1800 / 1.0 / 24 = 75 m²

For 2 tanks: A_per_tank = 37.5 m²

Try D = 15 m per tank:

A = π × (15/2)² = 176.7 m² per tank
A_total = 176.7 × 2 = 353.4 m²

This is conservative (much larger than minimum 75 m²).

Step 2: Check HLR at All Flows ​

At DWF:

HLR = 600 / 353.4 / 24 = 0.071 m/h ✓
(Well below limit)

At ADF:

HLR = 960 / 353.4 / 24 = 0.113 m/h ✓

At FFT:

HLR = 1800 / 353.4 / 24 = 0.212 m/h ✓
(Well below 1.0 m/h limit)

Step 3: Check N-1 Compliance ​

With one tank out (area = 176.7 m²):

HLR_N-1 = 1800 / 176.7 / 24 = 0.424 m/h ✓
(Well below 2.0 m/h limit)

Step 4: Determine Tank Depth ​

Choose SWD = 2.5 m, conical depth = 1.0 m

Liquid volume (cylindrical):

V_liquid = A × SWD
V_liquid = 353.4 × 2.5 = 883.5 m³

Total volume (including conical hoppers):

V_cone_each = (1/3) × π × (7.5)² × 1.0 = 58.9 m³
V_total = 883.5 + (2 × 58.9) = 1,001.3 m³

Step 5: Check HRT ​

At DWF:

HRT = (883.5 / 600) × 24 = 35.3 hours

At ADF:

HRT = (883.5 / 960) × 24 = 22.1 hours

At FFT:

HRT = (883.5 / 1800) × 24 = 11.8 hours ✓
(Well above 2 hour minimum)

N-1 at FFT:

V_single = 176.7 × 2.5 = 441.8 m³
HRT_N-1 = (441.8 / 1800) × 24 = 5.9 hours ✓

Step 6: Calculate Humus Sludge Production ​

Capture from biofilter:

Sludge_solids = 48 × 0.85 = 40.8 kgSS/d

Sludge flow (at 2% DS):

Sludge_flow = 40.8 / (2 × 10) = 2.04 m³/d

Design Summary ​

ParameterValueCompliance
Configuration2 × 15 m diameter✓ N-1 capable
SWD2.5 m✓ > 2.0 m
Total surface area353.4 m²
Liquid volume883.5 m³
HLR at DWF0.071 m/h✓
HLR at FFT0.212 m/h✓ < 1.0 m/h
HLR N-1 at FFT0.424 m/h✓ < 2.0 m/h
HRT at DWF35.3 hours✓
HRT at FFT11.8 hours✓ > 2 hours
HRT N-1 at FFT5.9 hours✓ > 2 hours
Humus sludge2.04 m³/d at 2% DS

UK Water Company Variations ​

UK Industry Practice ​

  • HLR: 0.8 m/h preferred at FFT (more conservative than 1.0)
  • SWD: 2.5-3.0 m typical
  • Minimum 2 tanks, prefer 3 for larger works (> 10,000 PE)

UK Industry Practice ​

  • HLR: 1.0 m/h at FFT (as per PS221)
  • Rectangular tanks common for large works
  • Combined biofilter/humus tank duty in process design

UK Industry Practice ​

  • N-1 strictly enforced for all new works
  • HRT: 3 hours minimum preferred at FFT
  • Covered tanks for odor control in urban catchments

Design Considerations ​

Tank Configuration ​

Radial tanks advantages:

  • Simple sludge collection (rotating scraper)
  • Good for small-medium works (PE < 20,000)
  • Compact footprint
  • Well-proven technology

Rectangular tanks advantages:

  • Better for large works (PE > 20,000)
  • Multiple lanes possible
  • Chain-and-flight scrapers robust
  • Easier integration with rectangular biofilters

Inlet Arrangements ​

Radial tanks:

  • Central feed well with stilling chamber
  • Diameter = 10-15% of tank diameter
  • Inlet velocity < 0.3 m/s
  • Radial baffles to dissipate energy

Rectangular tanks:

  • End-feed with baffle wall
  • Full-width distribution channel
  • Submerged inlet (avoid surface turbulence)

Outlet Arrangements ​

Weir configuration:

  • Peripheral weir for radial tanks (full circumference)
  • End weir for rectangular tanks (full width)
  • V-notch weirs for even flow distribution

Weir loading:

W_load = Q / L_weir

Typical: < 150 m³/m/d (same as primary tanks)

Sludge Collection ​

Radial tanks:

  • Rotating scraper bridge: 0.02-0.05 rpm
  • Hopper diameter: 1.5-3.0 m
  • Continuous or intermittent withdrawal

Rectangular tanks:

  • Chain-and-flight scrapers
  • Scraper speed: 0.6-1.2 m/min
  • Hoppers at inlet end

Sludge withdrawal:

  • Frequency: Every 2-4 hours typical
  • Duration: 10-15 minutes per cycle
  • Desludging rate: Balance concentration vs volume

Common Design Issues ​

Poor Sludge Settlement ​

Problem: High effluent SS, blanket rising.

Causes:

  • Excessive HLR (> 1.2 m/h)
  • Biofilter overloading (poor floc formation)
  • Denitrification in sludge blanket (N₂ gas flotation)
  • Septicity (H₂S production, gas bubbles)

Solutions:

  • Reduce HLR (add tank area or reduce flow to FFT)
  • Optimize biofilter loading
  • Increase sludge withdrawal frequency
  • Avoid long sludge retention (< 4 hours in tank)

Denitrification in Blanket ​

Problem: Sludge blanket floats due to N₂ gas from nitrate reduction.

Mechanism:

NO₃⁻ + organic carbon → N₂ (gas) + CO₂

Gas bubbles attach to sludge floc, causing flotation.

Solutions:

  • Increase sludge withdrawal rate (reduce blanket depth)
  • Reduce nitrate in biofilter (lower recirculation)
  • Avoid high sludge blanket levels (< 0.5 m typical)
  • Consider de-nitrification filter upstream

Insufficient N-1 Capacity ​

Problem: Works cannot operate with one tank out.

Solution:

  • Size for N-1 from start (each tank handles full FFT at 2.0 m/h)
  • For 2-tank configuration, this means 50% oversizing vs nominal
  • Or use 3 tanks with each at 67% capacity

Hydraulic Overloading in Storms ​

Problem: Solids carryover during storm flows.

Solutions:

  • Storm flow diversion upstream (limit to FFT = 6 DWF)
  • Storm tanks to attenuate peak flows
  • Chemically-assisted settlement (PAC dosing)

Effluent Polishing ​

Humus tanks provide additional BOD/NH₃ polishing beyond biofilter.

Additional Removal in Humus Tank ​

ParameterBiofilter EffluentHumus Tank EffluentAdditional Removal
BOD30-40 mg/L15-25 mg/L15-25%
SS30-50 mg/L15-25 mg/L50% (biomass capture)
NH₄-N6-8 mg/L5-7 mg/L10-15%

Mechanisms:

  • SS removal: Gravity settling of sloughed biomass
  • BOD removal: Continued oxidation in biofilm on settled solids
  • NH₄-N removal: Nitrification in thin biofilm on tank surfaces

Liquor Return from Sludge Thickening ​

Humus sludge is often thickened before disposal, producing a liquor return stream.

Typical Liquor Characteristics ​

ParameterConcentration (mg/L)Return Load Contribution
TSS500Low (< 5% influent)
BOD750Medium (10-15% influent)
NH₄-N100High (20-30% influent)
TP10Low (5-10% influent)

Design impact:

  • Return liquor to inlet works (before primary tanks)
  • Account for loads in overall mass balance
  • NH₄-N return can be significant (consider in alkalinity balance)

Liquor return calculation:

Load_return = (C × Q_liquor) / 1000

Where:

  • C = pollutant concentration in liquor (mg/L)
  • Q_liquor = liquor flow rate (m³/d)


References ​

  • UK Sewers for Adoption (7th Edition): Appendix PS221 - Humus Tanks
  • UK operator Design Standards: Secondary settling design criteria
  • WRc/CIRIA: Final clarifier design for biological treatment

Navigation: