Chemical precipitation is used for phosphorus (P) removal in wastewater treatment, typically using ferric or aluminum salts. This guide focuses on ferric sulphate dosing following UK water industry operational guidelines.
UK Industry Molar Ratio Standards
Fe:P Molar Ratios by Dosing Stage
| Dosing Stage | Minimum | Typical | Maximum | Target P Removal |
|---|---|---|---|---|
| Primary | 1.50 | 1.66 | 1.80 | 60-80% |
| Secondary | 1.60 | 1.80 | 2.00 | 70-90% |
| Tertiary | 1.80 | 2.00 | 2.20 | 80-95% |
General principle:
- Higher Fe:P ratios → Higher P removal efficiency
- Later stages require higher ratios for diminishing returns
- Typical practice: Use 1.66:1 for primary or secondary dosing
###Alternative Coagulants
| Chemical | Formula | Fe/Al Content | Molar Ratio (M:P) | Notes |
|---|---|---|---|---|
| Ferric sulphate | Fe₂(SO₄)₃ | 12% Fe | 1.5-2.2 (Fe:P) | Most common in UK |
| Ferric chloride | FeCl₃ | 38-45% Fe | 1.5-2.2 (Fe:P) | Higher Fe content, more corrosive |
| Aluminum sulphate | Al₂(SO₄)₃ | 8% Al | 1.5-2.5 (Al:P) | Alternative to Fe, common in drinking water |
| PAC | Al_n(OH)_m(Cl)₃ₙ₋ₘ | 10% Al | 1.5-2.5 (Al:P) | Polyaluminum chloride, wide pH range |
Design Equations
Core Dosing Calculations
Iron Dose from P Load
Formula:
Fe_dose = P_load × (Fe:P ratio) × (MW_Fe / MW_P)Where:
Fe_dose= iron required (kg Fe/d)P_load= phosphorus to be removed (kg P/d)Fe:P ratio= molar ratio (e.g., 1.66)MW_Fe= molar mass of Fe = 56 g/molMW_P= molar mass of P = 31 g/molMW_Fe / MW_P= 56/31 = 1.806
Example:
P_load = 10 kg/d
Fe:P ratio = 1.66 (typical)
Fe_dose = 10 × 1.66 × 1.806 = 29.98 kg Fe/dCompound Dose from Fe Dose
Formula:
Compound_dose = Fe_dose / (Fe_content / 100)Where:
Compound_dose= ferric sulphate required (kg/d)Fe_content= % Fe in compound (typically 12% for ferric sulphate)
Example (ferric sulphate at 12% Fe):
Fe_dose = 30 kg Fe/d
Fe_content = 12%
Compound_dose = 30 / 0.12 = 250 kg ferric sulphate/dVolumetric Dosing Rate
Formula:
Dose_rate = Compound_dose / Density / 24Where:
Dose_rate= volumetric dosing rate (L/h)Density= solution density (kg/L, typically 1.5 for ferric sulphate)
Example:
Compound_dose = 250 kg/d
Density = 1.5 kg/L
Dose_rate = 250 / 1.5 / 24 = 6.94 L/hDosing Stage Selection
Primary Stage Dosing
Location: Dosed into primary sedimentation tanks
Advantages:
- Simultaneous P and SS removal
- Enhanced primary sludge settleability
- H₂S odor control (bonus benefit)
- Lower overall sludge volume vs later stages
Disadvantages:
- Lower P removal efficiency (60-80%)
- Higher chemical consumption for given removal
- No BOD enhancement
Typical application:
- Works with primary treatment
- Moderate P consents (≤ 2 mg/L)
- Where sludge minimization is priority
Fe:P ratio: 1.66:1 (typical)
Secondary Stage Dosing
Location: Dosed into biofilter effluent or humus tanks
Advantages:
- Higher P removal efficiency (70-90%)
- Improved humus sludge settlement
- Can retrofit to existing works
Disadvantages:
- Chemical sludge separate from primary
- May interfere with biofilter performance if overdosed
- Requires good mixing
Typical application:
- Biofilter works without primary treatment
- Stricter P consents (≤ 1 mg/L)
- Retrofit applications
Fe:P ratio: 1.80:1 (typical)
Tertiary Stage Dosing
Location: Dosed after all biological treatment (polishing)
Advantages:
- Highest P removal (80-95%)
- Fine-tuning to meet very low consents
- No interference with biological processes
Disadvantages:
- Highest chemical consumption per kg P removed
- Additional settling/filtration required
- Separate sludge handling
Typical application:
- Very strict P consents (≤ 0.5 mg/L)
- Sensitive receiving waters (eutrophic lakes)
- Works with advanced treatment trains
Fe:P ratio: 2.00:1 (typical)
P Removal Efficiency
Efficiency by Stage and Ratio
Primary dosing:
Efficiency (%) = 60 + 20 × ((ratio - 1.5) / (1.8 - 1.5))Range: 60-80%
Secondary dosing:
Efficiency (%) = 70 + 20 × ((ratio - 1.6) / (2.0 - 1.6))Range: 70-90%
Tertiary dosing:
Efficiency (%) = 80 + 15 × ((ratio - 1.8) / (2.2 - 1.8))Range: 80-95%
Example (primary, Fe:P = 1.66):
Efficiency = 60 + 20 × ((1.66 - 1.5) / 0.3)
Efficiency = 60 + 20 × 0.533 = 70.7%Effluent P Calculation
Formula:
P_effluent = P_influent × (1 - E/100)Example:
P_influent = 12 mg/L
Efficiency = 70%
P_effluent = 12 × (1 - 0.70) = 3.6 mg/LChemical Sludge Production
Sludge from Ferric Sulphate
Formula:
Sludge_production = Fe_dose × S_factorWhere:
Sludge_production= chemical sludge (kgSS/d)Fe_dose= iron dosed (kg Fe/d)S_factor= sludge factor = 2.3 kgSS/kg Fe (typical)
Derivation:
Fe precipitation: Fe³⁺ + PO₄³⁻ → FePO₄ (solid)
Fe hydrolysis: Fe³⁺ + 3OH⁻ → Fe(OH)₃ (solid)
Combined: 1 kg Fe → ~2.3 kg dry solidsExample:
Fe_dose = 30 kg Fe/d
Sludge = 30 × 2.3 = 69 kgSS/dCombined with primary sludge:
Total_sludge = Primary_sludge + Chemical_sludge
Total_sludge = 105 + 69 = 174 kgSS/dStorage Requirements
Chemical Storage Tank Sizing
UK operator standard: 28 days storage minimum
Formula:
Storage_volume = Compound_dose × Storage_days / Density / 1000Where:
Storage_volume= tank capacity (m³)Storage_days= typically 28 days (UK operator)Density= solution density (kg/L)
Example:
Compound_dose = 250 kg/d
Storage_days = 28 days
Density = 1.5 kg/L
Storage = (250 × 28) / 1.5 / 1000 = 4.67 m³Delivery Mass
Formula:
Delivery_mass = Storage_volume × DensityWhere:
Delivery_mass= tanker delivery (tonnes)
Example:
Storage = 4.67 m³
Density = 1.5 kg/L = 1,500 kg/m³ = 1.5 tonnes/m³
Delivery = 4.67 × 1.5 = 7.0 tonnes per deliveryDelivery frequency:
Frequency = Storage_days = 28 days (~ monthly)Worked Example
Design Basis
- Population: 5,000 PE
- DWF: 600 m³/d
- Influent TP: 12 mg/L
- Target effluent TP: ≤ 2 mg/L (consent)
- Dosing stage: Primary
- Chemical: Ferric sulphate (12% Fe)
Step 1: Calculate P Load
Influent load:
P_inf = (12 mg/L × 600 m³/d) / 1000 = 7.2 kg P/dTarget effluent:
P_eff = 2 mg/L
P_eff_load = (2 mg/L × 600 m³/d) / 1000 = 1.2 kg P/dP to be removed:
P_removal = 7.2 - 1.2 = 6.0 kg P/d
Removal efficiency = 6.0 / 7.2 × 100 = 83.3%Step 2: Select Fe:P Ratio
For primary dosing to achieve 83% removal:
Target E = 83%
Primary range: 60-80% typical
Use higher end ratio: Fe:P = 1.75 (between typical 1.66 and max 1.80)Step 3: Calculate Fe Dose
Formula:
Fe_dose = P_removal × Fe:P × (56/31)
Fe_dose = 6.0 × 1.75 × 1.806
Fe_dose = 18.96 kg Fe/d ≈ 19 kg Fe/dStep 4: Calculate Compound Dose
Ferric sulphate (12% Fe):
Compound = 19 / 0.12 = 158.3 kg/dStep 5: Calculate Dosing Rate
Volumetric rate:
Dose_rate = 158.3 / 1.5 / 24 = 4.40 L/hDaily volume:
Daily_volume = 4.40 × 24 = 105.6 L/dStep 6: Calculate Storage
28-day storage:
Storage = (158.3 × 28) / 1.5 / 1000 = 2.95 m³
Select: 3.0 m³ tank (with 2% margin)Delivery mass:
Delivery = 3.0 × 1.5 = 4.5 tonnes per monthStep 7: Calculate Chemical Sludge
Sludge production:
Chem_sludge = 19 × 2.3 = 43.7 kgSS/dImpact on primary sludge: Assuming 105 kgSS/d from primary alone:
Total_primary = 105 + 43.7 = 148.7 kgSS/d
Increase = 43.7 / 105 × 100 = 42% increaseCombined sludge flow (3% DS):
Sludge_flow = (148.7 / 1000) / 0.03 = 4.96 m³/d
(vs 3.5 m³/d without chemical)Step 8: Verify Compliance
Predicted effluent TP: Using Fe:P = 1.75 for primary:
Efficiency ≈ 78% (from correlation)
P_eff = 12 × (1 - 0.78) = 2.64 mg/LThis is above target of 2.0 mg/L.
Adjustment: Increase to Fe:P = 1.80 (max for primary)
Fe_dose = 6.0 × 1.80 × 1.806 = 19.5 kg Fe/d
Efficiency ≈ 80%
P_eff = 12 × (1 - 0.80) = 2.4 mg/LStill above target. Consider secondary dosing instead:
Using secondary dosing with Fe:P = 1.80:
Efficiency ≈ 80% (secondary range: 70-90%)
P_eff = 12 × (1 - 0.80) = 2.4 mg/LOr Fe:P = 1.90:
Efficiency ≈ 85%
P_eff = 12 × (1 - 0.85) = 1.8 mg/L ✓Revised Design Summary
| Parameter | Value | Notes |
|---|---|---|
| Dosing stage | Secondary (humus tanks) | For higher efficiency |
| Fe:P molar ratio | 1.90 | Between typical 1.80 and max 2.00 |
| P removal efficiency | 85% | |
| Fe dose | 20.6 kg Fe/d | |
| Compound dose | 171.7 kg/d | Ferric sulphate (12% Fe) |
| Dosing rate | 4.77 L/h | |
| Storage tank | 3.2 m³ | 28 days @ 1.5 kg/L density |
| Delivery frequency | Monthly | 4.8 tonnes per delivery |
| Chemical sludge | 47.4 kgSS/d | |
| Predicted effluent TP | 1.8 mg/L | ✓ Meets 2.0 mg/L consent |
UK Water Company Variations
UK Industry Practice
- Fe:P ratios as specified above (1.5-2.2)
- 28-day chemical storage mandatory
- Prefer secondary dosing for P removal
- Monthly site visits for performance verification
UK Industry Practice
- Similar Fe:P ratios
- Often use aluminum sulphate in some catchments
- Require detailed mass balance for consent compliance
- Continuous P monitoring on larger works
UK Industry Practice
- Use ferric chloride in some areas (higher Fe%)
- Prefer primary dosing where compatible with sludge treatment
- Strict reporting on chemical consumption
Design Considerations
Dosing Point Selection
Primary tanks:
- Dose at inlet channel or distribution chamber
- Good mixing from inlet turbulence
- Rapid precipitation and co-settlement
- Monitor primary sludge density (target 4-6% DS)
Biofilter effluent:
- Dose before humus tanks
- Ensure good mixing (baffled channel or static mixer)
- Allow 10-20 minutes contact time
- Monitor humus sludge for Fe accumulation
Tertiary (after humus):
- Dose into separate contact tank
- Provide flocculation (gentle mixing, 15-30 min)
- Followed by settlement or filtration
- Separate sludge handling required
Mixing Requirements
Rapid mix:
- G value: 300-600 s⁻¹
- Time: 30-60 seconds
- Purpose: Distribute chemical, initiate precipitation
Flocculation:
- G value: 20-60 s⁻¹
- Time: 15-30 minutes
- Purpose: Grow settleable flocs
Equation for mixing intensity:
G = √(P / μ / V)Where:
G= velocity gradient (s⁻¹)P= power input (W)μ= dynamic viscosity (Pa·s)V= tank volume (m³)
pH Considerations
Optimal pH ranges:
- Ferric salts: pH 5.0-8.5 (optimal 6.0-7.5)
- Aluminum salts: pH 5.5-7.5 (optimal 6.0-7.0)
pH depression from dosing: Ferric sulphate is acidic and consumes alkalinity:
Alkalinity consumed = Fe_dose × 0.75 kg CaCO₃/kg FeSee Alkalinity Balance for full calculation.
Example:
Fe_dose = 20 kg Fe/d
Alk consumed = 20 × 0.75 = 15 kg CaCO₃/dIf this drives effluent pH < 6.5 or alkalinity < 50 mg/L, add lime or caustic soda.
Alkalinity and Bicarbonate Dosing
If pH falls below optimal:
Lime addition:
Lime_dose = Alkalinity_deficit / 0.74Where 0.74 converts CaCO₃ equivalent to CaO.
Caustic soda alternative:
NaOH_dose = Alkalinity_deficit / 1.25Where 1.25 converts CaCO₃ to NaOH equivalent.
Dosing Equipment
Dosing Pumps
Types:
- Diaphragm metering pumps (most common)
- Peristaltic pumps (lower capacity)
- Progressive cavity pumps (higher capacity)
Sizing:
- Max flow: 150-200% of average dose rate (turndown 10:1)
- Example: Average 5 L/h → Select 10 L/h max pump
- Redundancy: Minimum 2 pumps (duty + standby)
Control:
- Flow-proportional dosing (most common)
- Compound loop (P analyzer feedback, optional)
- Manual trim adjustment (±20%)
Storage and Handling
Tank material:
- Ferric sulphate: HDPE, GRP (not mild steel)
- Level indication: Ultrasonic or pressure transmitter
- Bunding: 110% of tank capacity
Safety:
- Ferric sulphate: Corrosive, pH ~2
- PPE: Goggles, gloves, apron
- Spillage: Neutralize with lime, wash down
- Ventilation: Adequate for fumes (acidic vapor)
Monitoring and Control
Key Parameters
| Parameter | Frequency | Method | Target |
|---|---|---|---|
| Influent TP | Daily | Laboratory | Baseline |
| Effluent TP | Daily | Laboratory | < Consent limit |
| Fe dose rate | Continuous | Pump stroke counter | Per design |
| Chemical stock | Weekly | Level gauge | > 7 days |
| Sludge %DS | Weekly | Laboratory | 4-6% (primary) |
Optimization
Jar testing:
- Periodic jar tests to verify optimal Fe:P ratio
- Especially after significant influent changes
- Test range: ±20% around design ratio
Dose trimming:
If effluent TP consistently < target: Reduce dose by 10%
If effluent TP > target: Increase dose by 10%
Repeat until stable at target ± 15%Cost optimization:
Chemical_cost = Compound_dose × Unit_priceTypical ferric sulphate: £150-200/tonne
Example:
Dose = 170 kg/d = 5.1 tonnes/month
Price = £180/tonne
Monthly cost = 5.1 × £180 = £918/monthCommon Dosing Issues
Over-Dosing
Symptoms:
- Effluent TP well below consent (wasted chemical)
- Yellow/brown color in effluent (residual Fe)
- Excessive sludge production
Solutions:
- Reduce Fe:P ratio
- Check influent TP (may have decreased)
- Optimize based on effluent monitoring
Under-Dosing
Symptoms:
- Effluent TP exceeds consent
- Poor sludge settlement (insufficient coagulation)
Solutions:
- Increase Fe:P ratio
- Check for short-circuiting (poor mixing)
- Verify pump calibration and chemical strength
Poor Mixing
Symptoms:
- Variable effluent TP
- Poor sludge settlement (incomplete precipitation)
- Chemical accumulation in corners
Solutions:
- Add static mixer or baffle
- Increase dosing point turbulence
- Relocate dose point to higher energy zone
Sludge Handling Issues
Symptoms:
- Sludge difficult to thicken (Fe-rich sludge)
- Dewatering problems (high Fe binds water)
Solutions:
- Optimize Fe dose (avoid over-dosing)
- Add polymer for dewatering (5-15 kg/tonne DS)
- Consider lime stabilization before dewatering
Related Calculations
- Alkalinity Balance: Alkalinity consumption from Fe dosing
- Sludge Production: Combined primary and chemical sludge
- Primary Tanks: Enhanced primary treatment with Fe
References
- UK operator Operational Guidelines: Chemical dosing for phosphorus removal
- CIWEM Best Practice: Ferric and aluminum dosing in wastewater treatment
- WRc Technical Guidance: Chemical phosphorus removal
Navigation: