Skip to content

Anthracite Filter ​

Single-media depth filtration using crushed anthracite coal (0.9-1.1 mm effective size) with higher void ratio and coarser grains than sand, enabling deeper solids penetration and longer filter runs.

Overview ​

Anthracite filters use crushed and graded anthracite coal as the filter media instead of silica sand. The key advantage is anthracite's lower density (1400-1700 kg/m³ vs. 2650 kg/m³ for sand) and coarser particle size, resulting in higher porosity (45% vs. 38-40% for sand) and deeper bed penetration of solids. This translates to longer filter runs and higher dirt-holding capacity.

When to Use ​

  • High TSS loading requiring long filter runs
  • Deeper bed filtration (1.2-2.0 m typical)
  • Applications where backwash frequency must be minimized
  • Retrofit of existing sand filters (deeper penetration, less headloss)
  • Pre-filtration before dual-media or GAC filters
  • High-rate tertiary treatment (12-20 m/h)

Key Characteristics ​

  • TSS removal: 15-25 mg/L → 3-5 mg/L
  • Filtration rate: 10-20 m/h (higher than sand)
  • Filter run time: 48-120 hours (longer than sand)
  • Media depth: 1.0-2.0 m (deeper than sand)
  • Porosity: 0.45-0.50 (vs. 0.38-0.42 for sand)
  • Effective size: 0.9-1.5 mm (coarser than sand)
  • Lower headloss buildup rate

Operating Modes ​

Basic Mode ​

  • Fixed filtration rate
  • Constant removal efficiency
  • Time-based backwash trigger
  • Simple headloss calculation

Advanced Mode ​

  • Iwasaki depth filtration model (same as sand)
  • Dynamic filter coefficient λ(z,t) varying with depth
  • Headloss prediction with larger particle correlation
  • Backwash optimization
  • Comparison with sand filter performance

Mathematical Model ​

Governing Equations ​

Anthracite filtration follows the same Iwasaki model as sand filters, but with different parameters due to larger grain size and higher porosity.

1. Iwasaki Filtration Equation ​

$$\frac{\partial C}{\partial z} = -\lambda \times C$$

Solution:

$$C(z) = C_0 \times e^{-\lambda \times z}$$

Overall removal:

$$\eta = 1 - e^{-\lambda \times L}$$

Key difference: Anthracite has lower λ (due to coarser grains), requiring deeper beds for equivalent removal:

  • Sand (0.5 mm): λ ≈ 4-6 m⁻¹
  • Anthracite (1.0 mm): λ ≈ 2-4 m⁻¹

2. Filter Coefficient (Yao Model) ​

$$\lambda = \frac{3(1-\epsilon)}{2 d_c} \times \eta_0$$

Where:

  • $\epsilon$ = 0.45-0.50 for anthracite (higher than sand)
  • $d_c$ = 0.9-1.5 mm for anthracite (larger than sand)

Result: Lower λ, requiring greater depth $L$ for same removal $\eta$.

3. Headloss - Carmen-Kozeny ​

Clean bed headloss:

$$h_0 = f \times \frac{L}{d_c} \times \frac{(1-\epsilon)^2}{\epsilon^3} \times \frac{v^2}{2g}$$

Comparison for same depth and velocity:

For sand: $d_c$ = 0.6 mm, $\epsilon$ = 0.40 $$\frac{(1-0.40)^2}{0.40^3} = \frac{0.36}{0.064} = 5.625$$

For anthracite: $d_c$ = 1.0 mm, $\epsilon$ = 0.47 $$\frac{(1-0.47)^2}{0.47^3} = \frac{0.281}{0.104} = 2.701$$

Anthracite has ~50% lower clean bed headloss than sand (for same depth/velocity).

Headloss buildup:

$$h(t) = h_0 + k_{buildup} \times \sigma(t)$$

Anthracite's higher porosity and coarser grains allow deeper penetration, so headloss builds up more slowly.

4. Backwash - Minimum Fluidization Velocity ​

$$v_{mf} = \frac{g \times d_c^2 \times (\rho_s - \rho_w)}{1650 \times \mu}$$

For anthracite ($\rho_s$ = 1500 kg/m³, $d_c$ = 1.0 mm) @ 15°C:

$$v_{mf} \approx 0.3-0.4 \text{ m/min} = 18-24 \text{ m/h}$$

Much lower than sand (36-48 m/h) due to lower density.

Design backwash rate: 1.3-1.5 × $v_{mf}$ = 25-35 m/h

Advantage: Lower backwash water consumption than sand.

Design Parameters ​

Input Parameters ​

ParameterSymbolUnitRangeDefaultDescription
Filtration rate$v$m/h10-2015Higher than sand
Media depth$L$m1.0-2.01.5Deeper than sand
Media size (d10)$d_c$mm0.9-1.51.0Effective size
Uniformity coefficientUC-1.3-1.61.4d60/d10
Bed porosity$\epsilon$-0.45-0.500.47Higher than sand
Influent TSS$C_0$mg/L10-3520Secondary effluent
Target effluent TSS$C_e$mg/L3-64Design goal
Filter run time$t_{run}$h48-12072Longer than sand
Terminal headloss$h_{max}$m2.0-3.02.5Backwash trigger
Backwash rate$v_{BW}$m/h25-4030Lower than sand
Backwash duration$t_{BW}$min8-1210Cleaning time

Output Parameters ​

ParameterUnitDescription
Filter aream²Required filtration area
Number of cells-Parallel filter cells
Filter coefficient λm⁻¹Iwasaki removal parameter (lower than sand)
Clean bed headlossmInitial pressure drop (lower than sand)
Headloss @ 72hmPredicted headloss buildup
Backwash frequencyhTime between backwashes (longer than sand)
Backwash water %%Percentage of production (lower than sand)
Annual anthracite cost£/yearReplacement due to loss/degradation

Configuration Guide ​

Step-by-Step Setup ​

  1. Determine Filtration Rate

    Anthracite can handle higher rates than sand:

    Standard tertiary polishing: 12-18 m/h (vs. 10-12 for sand)
    High-rate operation: 15-20 m/h
    Conservative (long runs): 10-12 m/h
    With chemical coagulation: 10-15 m/h
  2. Select Media Depth

    Deeper than sand to compensate for lower λ:

    For equivalent removal to 0.9m sand: Use 1.2-1.5m anthracite
    Standard depth: 1.5m
    High-rate, high-loading: 1.8-2.0m
  3. Calculate Required Area

    $$A = \frac{Q_{avg}}{v \times n_{operating}}$$

    Example:
    Q = 12,000 m³/d = 500 m³/h
    v = 15 m/h (high-rate)
    n_operating = 0.92 (8% offline, less frequent backwash)
    
    A = 500 / (15 × 0.92) = 36.2 m²
    
    Use 4 cells × 10 m² each = 40 m² (3.2m × 3.2m)
  4. Specify Anthracite Media

    Specification:

    • Source: Crushed anthracite coal
    • Effective size (d10): 0.9-1.2 mm
    • Uniformity coefficient: <1.5 (well-graded)
    • Depth: 1.5 m
    • Hardness: Moh's 2.0-2.8 (softer than sand, some attrition)
    • Acid solubility: <5%
    • Bulk density: 800-900 kg/m³ (dry)

    Gravel support (if not using nozzle floor):

    • Same as sand filter (300 mm total)
  5. Design Backwash System

    Lower backwash rates than sand:

    Backwash rate: v_BW = 30 m/h = 0.5 m/min
    Duration: t_BW = 10 minutes
    Cell area: A_cell = 10 m²
    
    Backwash volume per cycle = 0.5 × 10 × 10 = 50 m³
    
    Filter run time = 72 hours
    Backwashes per day = 4 cells / 72 h × 24 h = 1.33 backwashes/day
    
    Daily backwash volume = 1.33 × 50 = 66.5 m³/day
    Backwash % = 66.5 / 12,000 = 0.55% ✓ (very low!)
  6. Air Scour

    Highly recommended for anthracite:

    • Air rate: 0.6-1.0 m/min (same as sand)
    • Duration: 3-5 minutes before water backwash
    • Prevents media compaction
    • Reduces attrition losses

Typical Design Values ​

ApplicationFiltration Rate (m/h)Media Depth (m)Effluent TSS (mg/L)Run Time (h)Backwash %
Standard tertiary151.53-5720.5-1.0%
High-rate polishing181.84-6480.8-1.2%
With coagulant121.52-4720.6-1.0%
Low-rate (long runs)102.03-596+0.3-0.6%

Performance Criteria ​

TSS Removal Efficiency ​

Influent TSS (mg/L)Filtration Rate (m/h)Media Depth (m)Expected Effluent TSS (mg/L)
15-20151.53-5
20-25151.54-6
25-35121.85-7
15-20 (with coag)121.52-3

Note: Slightly lower removal efficiency than sand at same depth, but compensated by using deeper beds and handling higher loading.

Headloss Development ​

Anthracite advantage: Slower headloss buildup

Time (h)Sand (0.9m @ 10 m/h)Anthracite (1.5m @ 15 m/h)
0 (clean)0.15 m0.15 m
240.95 m0.50 m
481.65 m0.90 m
722.35 m (backwash!)1.40 m
96-1.95 m

Filter Run Comparison ​

For same TSS loading:

  • Sand filter: 24-48 hour runs
  • Anthracite filter: 48-120 hour runs (2-3× longer)

Troubleshooting ​

IssueCauseSolution
High effluent TSSInsufficient media depthIncrease to 1.8-2.0m
Filtration rate too highReduce to 12-15 m/h
Media too coarseReplace with finer anthracite (0.9mm)
Short-circuitingCheck flow distribution
Rapid headloss buildupHigh influent TSSPre-treatment or reduce rate
Media grading (fine on top)Vigorous backwash to remix
Biological growthChlorinate periodically
Media loss during backwashBackwash rate too highReduce to 25-30 m/h
Attrition (media breakdown)Replace with harder anthracite
Inadequate freeboardIncrease or add wash troughs
Poor backwash efficiencyInsufficient fluidizationIncrease backwash rate to 35-40 m/h
No air scourInstall air scour system
Media compactedBreak up with vigorous air scour
Media compactionInsufficient backwashIncrease rate or add air scour
Low-density fines on topSurface wash or air scour
ChannelingUneven backwashRepair underdrain distribution
Consolidated mediaAir scour to break up

Operation & Maintenance ​

Daily Checks ​

  • Monitor effluent turbidity/TSS
  • Record headloss for each cell
  • Observe filter run time (should be longer than sand)
  • Verify filtration rate
  • Inspect for media loss

Weekly Maintenance ​

  • Lab TSS measurement
  • Inspect backwash operation
  • Check for media compaction
  • Measure media depth
  • Review headloss development (compare to sand baseline)

Monthly Tasks ​

  • Check for media loss or attrition
  • Inspect underdrain
  • Verify air scour operation
  • Calibrate online instruments
  • Assess media grading (core sample)

Annual Tasks ​

  • Drain and inspect media condition
  • Measure effective size and UC (sieve analysis)
  • Replace lost or degraded media
  • Inspect underdrain and repair
  • Performance review vs. design
  • Consider switch to dual-media if upgrading

Media Replacement ​

Anthracite degradation:

  • Attrition: 3-5% loss per year (softer than sand)
  • Top-up required annually
  • Complete replacement: 8-12 years (vs. 10-15 for sand)

Cost: £300-600/tonne (vs. £50-150/tonne for sand)

Advanced Features ​

Biological Filtration ​

Anthracite's high porosity supports biofilm growth:

  • Nitrification at low rates (5-8 m/h)
  • Longer contact time than sand for same depth
  • Higher biofilm attachment surface area
  • Requires DO >2 mg/L, no residual chlorine

Variable Declining Rate (VDR) ​

Ideal for anthracite due to long runs:

  • Filters self-adjust flow based on headloss
  • Clean filters accept higher rates
  • Dirty filters slow down
  • Equalizes run time across cells
  • Simplifies operation (no rate control valves)

Comparison to Sand ​

ParameterSand FilterAnthracite Filter
Effective size0.5-0.7 mm0.9-1.2 mm
Porosity38-42%45-50%
Density2650 kg/m³1500 kg/m³
Typical depth0.9-1.2 m1.5-2.0 m
Filtration rate8-12 m/h12-18 m/h
Clean bed headlossHigherLower (50% less)
Filter run time24-48 h48-120 h
Backwash rate50-70 m/h25-40 m/h
Backwash water2-3%0.5-1.5%
Media cost£50-150/tonne£300-600/tonne
Media life10-15 years8-12 years

When to choose anthracite over sand:

  • Minimize backwash frequency and water use
  • High TSS loading
  • Space for deeper beds available
  • Willing to pay higher media cost for lower operating cost

Pre-Treatment for Dual-Media ​

Anthracite layer on top of sand creates dual-media filter:

  • Anthracite (coarse): Pre-filtration, remove bulk TSS
  • Sand (fine): Polishing, final removal
  • Combined benefits (see Dual-Media-Filter)

Worked Example ​

Given ​

  • Flow: 18,000 m³/d (average), 27,000 m³/d (peak)
  • Influent TSS: 22 mg/L (secondary effluent, higher loading)
  • Target effluent: <5 mg/L TSS
  • Application: High-rate tertiary treatment with infrequent backwash

Solution ​

Step 1: Select Filtration Rate

High-rate anthracite application: v = 15 m/h

Step 2: Calculate Area

Q_avg = 18,000 m³/d = 750 m³/h
Account for 8% offline (long runs): n_operating = 0.92

A = Q_avg / (v × n_operating) = 750 / (15 × 0.92) = 54.3 m²

Use 6 cells × 10 m² each = 60 m² (3.2m × 3.2m cells)

Step 3: Select Media Depth

For high loading and good removal: L = 1.8 m

Step 4: Verify Peak Conditions

Q_peak = 27,000 m³/d = 1,125 m³/h
With 1 cell offline: 5 cells operating
v_peak = 1,125 / (5 × 10) = 22.5 m/h
(High but acceptable for short peak with anthracite)

Step 5: Predict Performance

Anthracite λ ≈ 3 m⁻¹ (for 1.0mm @ 15 m/h)
L = 1.8 m

η = 1 - exp(-3 × 1.8) = 1 - exp(-5.4) = 1 - 0.0045 = 0.9955 = 99.55%
(This is too optimistic; real-world η ≈ 75-80% for anthracite)

Using empirical: C_effluent ≈ 22 × 0.22 = 4.8 mg/L ✓

Step 6: Backwash Design

Backwash rate: 30 m/h = 0.5 m/min
Duration: 10 minutes
Air scour: 1.0 m/min for 3 minutes

Backwash volume per cell = 0.5 × 10 × 10 = 50 m³
Filter run time: 72 hours

Backwashes per day = 6 cells / 72 h × 24 h = 2 backwashes/day
Daily backwash = 2 × 50 = 100 m³/day
Backwash % = 100 / 18,000 = 0.56% ✓ (excellent!)

Step 7: Media Quantity and Cost

Media volume per cell = 10 m² × 1.8 m = 18 m³
Total volume = 6 × 18 = 108 m³

Bulk density (dry): 850 kg/m³
Media mass = 108 m³ × 850 kg/m³ = 91,800 kg = 91.8 tonnes

Media cost (virgin): £450/tonne
Initial cost = 91.8 × £450 = £41,310

Annual replacement (5% attrition):
Annual cost = 91.8 × 0.05 × £450 = £2,066/year
Specific cost = £2,066 / (18,000 × 365) = £0.00031/m³ (negligible)

Step 8: Headloss Prediction

Clean bed (empirical for anthracite): h_0 ≈ 0.20 m @ 15 m/h, 1.8m depth

After 72h with 22 mg/L TSS:
h_72 ≈ 0.20 + 1.4 = 1.6 m ✓ (well below 2.5m limit)

Sand equivalent would be ~2.3m after 72h (closer to backwash trigger)

References ​

  1. Cleasby, J.L. and Logsdon, G.S. (1999). "Granular Bed and Precoat Filtration." Water Quality and Treatment, AWWA, 5th Ed., McGraw-Hill, Ch. 8.
  2. Kawamura, S. (2000). Integrated Design and Operation of Water Treatment Facilities, 2nd Ed., Wiley, pp. 251-298.
  3. WEF (2018). Design of Municipal Wastewater Treatment Plants, MOP 8, 6th Ed., Ch. 16.
  4. Metcalf & Eddy (2014). Wastewater Engineering, 5th Ed., pp. 1242-1290.
  5. Adin, A. and Rajagopalan, R. (1989). "Breakthrough Curves for Removal of Suspended Solids in Deep Bed Filters." Water Research 23(1): 73-79.