Preliminary Treatment ​

First stage of wastewater treatment focused on removing large solids, grit, and FOG to protect downstream equipment and processes.

Overview ​

Preliminary treatment (also called pretreatment or primary screening) removes materials that could damage equipment, interfere with treatment processes, or create operational problems. This includes large debris, grit, sand, and fats/oils/grease (FOG).

Purpose of Preliminary Treatment ​

  1. Equipment Protection

    • Prevent pump damage and clogging
    • Protect fine screens, membranes, and mechanical equipment
    • Reduce wear on pipes and valves
  2. Process Optimization

    • Minimize grit accumulation in tanks and digesters
    • Prevent FOG interference with biological processes
    • Improve efficiency of downstream treatment
  3. Operational Benefits

    • Reduce maintenance requirements
    • Minimize odor issues
    • Simplify sludge handling

Process Unit Categories ​

Screening ​

Removal of large and fine suspended solids through physical barriers.

Coarse Screen ​

  • Bar spacing: 25-75mm
  • Purpose: Remove large debris (rags, sticks, plastics)
  • Location: First unit in treatment train
  • Removal: 95% of particles >spacing
  • Screenings: 5-60 L/1000m³ (depends on sewer type)

When to Use:

  • All municipal WWTPs (essential first step)
  • Pumping stations before pumps
  • Combined sewer systems

Fine Screen ​

  • Opening size: 1-6mm
  • Purpose: Remove fine suspended solids and fibers
  • TSS removal: 30-85% (depends on opening)
  • Can replace: Primary clarifiers in some designs
  • Screenings: 15-40 L/1000m³

When to Use:

  • Modern plants (increasingly common)
  • MBR/MBBR pretreatment
  • Primary treatment alternative
  • Space-limited installations

Drum Screen ​

  • Configuration: Rotating perforated drum
  • Opening size: 0.5-6mm
  • Footprint: Very compact (1/3 of static screens)
  • TSS removal: 35-90% (depends on opening)
  • Self-cleaning: Continuous spray wash

When to Use:

  • Space-limited sites
  • High or variable flows
  • Fibrous industrial wastewaters
  • Stable headloss requirements

Step Screen ​

  • Mechanism: Moving steps lift screenings
  • Bar spacing: 3-25mm
  • Self-cleaning: Mechanical step action
  • Reliability: Excellent (no spray wash needed)
  • TSS removal: 30-80% (depends on spacing)

When to Use:

  • Municipal headworks (reliable performance)
  • Combined sewer systems
  • Fibrous materials
  • When dry screenings are valuable

Grit Removal ​

Separation of heavy inorganic particles (sand, gravel, grit) from organic solids.

Grit Chamber ​

  • Type: Horizontal flow sedimentation
  • Velocity control: 0.15-0.45 m/s (typically 0.30)
  • Detention: 45-90 seconds
  • Target particle: 0.21mm @ SG 2.65
  • Footprint: Large

When to Use:

  • All municipal plants (standard practice)
  • Combined sewers (high grit loads)
  • Simple, proven technology
  • Large site area available

Vortex Grit Separator ​

  • Type: Induced vortex in circular basin
  • Detention: 20-45 seconds
  • Footprint: Very compact (1/5 of horizontal)
  • Flow range: Wide (10:1 typical)
  • Organic content: Excellent separation (<5%)

When to Use:

  • Space-limited installations
  • Variable flow (combined sewers)
  • Retrofits
  • High capital budget

Aerated Grit Chamber ​

  • Type: Air-induced helical flow
  • Detention: 2-5 minutes
  • Air supply: 0.15-0.45 m³/min/m²
  • Organic content: Excellent (3-8%)
  • Benefit: Pre-aeration (10-20% BOD removal)

When to Use:

  • Plants needing excellent grit/organic separation
  • When grit washing is limited
  • Pre-aeration benefit desired
  • Industrial high-organic wastewaters

FOG Removal ​

Removal of fats, oils, and grease through density separation.

Grease Trap ​

  • Type: Gravity separation (buoyancy)
  • Detention: 10-60 minutes (typically 20-30)
  • FOG removal: 85-95% (free FOG)
  • Application: Food service, commercial kitchens
  • Maintenance: Regular pumping (1-3 months)

When to Use:

  • Restaurants, commercial kitchens
  • Food processing facilities
  • Before discharge to sewer
  • Where FOG >50 mg/L

Size Reduction (Alternative to Screening) ​

Comminutor ​

  • Function: Shreds solids instead of removing them
  • Output size: <6-10mm
  • Purpose: Pump protection
  • Solids removal: 0% (size reduction only)
  • Modern use: Declining (screening preferred)

When to Use:

  • Pumping stations (supplemental to screening)
  • Small plants with limited space
  • Industrial specific applications

Not Recommended For:

  • Primary treatment replacement
  • MBR/membrane pretreatment
  • High-performance biological systems

Typical Treatment Train Configurations ​

Standard Municipal Plant (Separate Sewers) ​

Influent → Coarse Screen (50mm) → Grit Chamber → Fine Screen (3mm) → Primary Clarifier → ...

Modern Compact Plant ​

Influent → Coarse Screen (50mm) → Fine Screen (1-3mm) → Vortex Grit → Biological Treatment → ...
                                                                    (no primary clarifier)

MBR Plant ​

Influent → Coarse Screen → Fine Screen (1mm) → Vortex Grit → MBR → ...

Combined Sewer System ​

Influent → Coarse Screen (75mm) → Vortex Grit Separator → Fine Screen (6mm) → Primary → ...

Small Pumping Station ​

Influent → Coarse Screen → [Comminutor] → Pumps → Force Main
                         (optional)

Design Criteria Summary ​

Screening ​

Unit TypeRemovalHeadlossFootprintScreeningsCapital Cost
Coarse ScreenLarge debris150-600mmMedium5-60 L/1000m³Low
Fine Screen30-85% TSS200-600mmMedium15-40 L/1000m³Medium
Drum Screen35-90% TSS100-300mmSmall15-40 L/1000m³High
Step Screen30-80% TSS50-500mmLarge15-40 L/1000m³High

Grit Removal ​

Unit TypeGrit RemovalOrganic in GritFootprintDetentionCapital Cost
Horizontal Chamber90-95%20-40% (unwashed)Large45-90sLow
Vortex Separator95-99%5-10%Very Small20-45sHigh
Aerated Chamber95-98%3-8%Medium2-5 minMedium

FOG Removal ​

ApplicationTrap SizeDetentionCleaning Frequency
Small restaurant (<50 seats)3-6 m³20 min4-8 weeks
Large restaurant (>150 seats)18-36 m³30 min2-4 weeks
Food processing24-72 m³40 min1-2 weeks

UK Design Standards ​

Screening ​

ParameterCoarseFine
Approach velocity0.6-1.0 m/s0.8-1.2 m/s
Through-screen velocity<0.9 m/s<0.6 m/s
Headloss (clean)<150mm<200mm
Headloss (max)<600mm<600mm

Grit Removal ​

ParameterHorizontalVortexAerated
Velocity/Detention0.30 m/s / 60s- / 30s- / 3 min
Channels≥2≥1≥2
Organic content target<5% (washed)<5%<8%

Performance Expectations ​

Typical Removal Efficiencies ​

ParameterPreliminary TreatmentNotes
Large debris (>25mm)>95%Coarse screening
TSS10-60%Depends on screen opening
BOD5-25%Mainly from fine screening
COD5-20%Screens + grit
Grit (>0.21mm)90-98%Grit chambers/separators
FOG (free)85-95%Grease traps

Waste Streams Generated ​

StreamQuantityCharacteristicsDisposal
Screenings (coarse)5-60 L/1000m³Wet, high organics (50-70%)Landfill, incineration
Screenings (fine)15-40 L/1000m³Wet, moderate organics (30-50%)Landfill, washing + landfill
Grit (unwashed)5-90 L/1000m³Wet, organics 20-40%Washing required
Grit (washed)5-90 L/1000m³Low organics (<5%)Landfill, beneficial reuse
FOGVariableHigh organics, energy contentRendering, anaerobic digestion

Operational Considerations ​

Automation ​

  • Most modern units are fully automatic
  • Level/headloss sensors trigger cleaning cycles
  • Remote monitoring increasingly common
  • Manual backup always required

Maintenance Requirements ​

UnitFrequencyKey Tasks
ScreensDailyVisual check, cleaning verification
WeeklyLubrication, spray wash check
MonthlyDetailed inspection, bar condition
Grit UnitsDailyVisual check, removal operation
WeeklyCheck velocity/air (if aerated)
QuarterlyDrain and clean, inspect
Grease TrapsMonthlyMeasure FOG/solids layers
1-3 monthsPump out and clean

Common Issues ​

IssueLikely CausePrevention
Screen blindingFats, fibers, inadequate cleaningIncrease cleaning, add washing
Grit carryoverVelocity too high, short-circuitingCheck flow control, baffles
FOG in effluentTrap full, emulsificationRegular pumping, no detergents
OdorSepticity, poor ventilationReduce retention, improve venting

Integration with Downstream Processes ​

Primary Treatment ​

  • Preliminary treatment protects primary clarifiers
  • Fine screens may replace primary in compact designs
  • Grit removal essential to prevent accumulation

Biological Treatment ​

  • TSS removal improves biological performance
  • Grit prevents abrasion of diffusers, mixers
  • FOG removal prevents biomass inhibition

Membrane Systems (MBR/UF/MF) ​

  • Very fine screening critical (<1-2mm)
  • Excellent grit removal essential
  • FOG must be minimal (<10-20 mg/L)

Technology Selection Guide ​

Choose Coarse + Fine Screens When: ​

  • Municipal plant (most common configuration)
  • High TSS removal desired
  • MBR or membrane downstream
  • Screenings disposal is acceptable

Choose Horizontal Grit Chamber When: ​

  • Large site area available
  • Simple, proven technology preferred
  • Grit washing facilities available
  • Low capital budget

Choose Vortex Grit When: ​

  • Space very limited
  • Wide flow variations (combined sewers)
  • Retrofit applications
  • Excellent separation needed

Choose Aerated Grit When: ​

  • Grit washing not available
  • Pre-aeration benefit desired
  • Industrial high-organic wastewaters
  • Moderate footprint acceptable

Emerging Technologies ​

  • Fine screening replacing primary clarifiers (more compact plants)
  • Perforated plate screens (1-3mm replacing clarifiers)
  • Compact vortex units (replacing large chambers)
  • Automated monitoring (headloss, efficiency, cleaning optimization)

Sustainability Improvements ​

  • Energy recovery from screenings (anaerobic digestion, incineration)
  • Grit beneficial reuse (construction aggregate)
  • FOG to biodiesel (rendering, energy recovery)
  • Primary-Treatment - Next treatment stage
  • Pumps - Protected by preliminary treatment
  • Biological-Treatment - Benefits from upstream solids removal
  • Sludge-Treatment - Handles preliminary treatment wastes

References ​

  1. Metcalf & Eddy (2014). Wastewater Engineering: Treatment and Reuse, 5th Ed. McGraw-Hill.
  2. WEF (2018). Design of Municipal Wastewater Treatment Plants, MOP 8, 6th Ed.
  3. Tchobanoglous, G. et al. (2003). Wastewater Engineering: Treatment and Reuse, 4th Ed. McGraw-Hill.
  4. MWH (2005). Water Treatment: Principles and Design, 2nd Ed. John Wiley & Sons.
  5. Water UK (2017). Sewers for Adoption, 8th Ed.
  6. WRc (1998). Sewage Treatment in Hot Climates. John Wiley & Sons.