Skip to content

Ultrafiltration (UF) ​

Pressure-driven membrane separation using 0.01-0.1 μm pores (MWCO 10-300 kDa) achieving virus-level removal at 0.5-2 bar operating pressure with fluxes of 30-100 LMH for advanced water treatment.

Overview ​

Ultrafiltration (UF) provides a tighter barrier than microfiltration, offering reliable removal of viruses in addition to bacteria and protozoa. UF operates in the transition zone between MF and nanofiltration, using membranes characterized by molecular weight cut-off (MWCO) rather than pore size. Common applications include drinking water treatment, water reuse, and pretreatment for reverse osmosis.

When to Use ​

  • Drinking water production (virus barrier, 4-6 log LRV)
  • Direct potable reuse (multi-barrier treatment)
  • RO pretreatment (superior to MF for high-fouling feeds)
  • Removal of dissolved macromolecules (proteins, polysaccharides)
  • Color removal (humic/fulvic acids)
  • Pharmaceutical/biotech water systems
  • Membrane bioreactor (MBR) for high-quality effluent
  • Dairy and food processing wastewater

Key Characteristics ​

  • Pore size: 0.01-0.1 μm (10-100 nm)
  • MWCO: 10-300 kDa (kilodaltons), typically 100 kDa
  • Operating pressure: 0.5-2 bar (5-30 psi)
  • Permeate flux: 30-100 LMH for wastewater
  • Recovery: 90-98%
  • Turbidity: <0.05 NTU (better than MF)
  • Bacteria removal: >6 log (validated)
  • Virus removal: 4-6 log (validated, absolute barrier)
  • Protozoa removal: >6 log
  • Dissolved organics: Partial (macromolecules >MWCO removed)
  • Backwash frequency: 20-60 minutes
  • CIP frequency: Weekly to monthly

Operating Modes ​

Basic Mode ​

  • Constant flux operation
  • Time-based backwash
  • Default resistance model
  • Simple TMP monitoring
  • Fixed MWCO

Advanced Mode ​

  • Resistance-in-series fouling model with gel polarization
  • Critical flux operation (flux < critical to minimize fouling)
  • TMP-based backwash trigger
  • CEB (chemically enhanced backwash) optimization
  • Fouling prediction (Hermia models)
  • Molecular weight fractionation modeling

Mathematical Model ​

Darcy's Law with Osmotic Pressure ​

For UF, concentration polarization creates osmotic pressure:

$$J = \frac{\Delta P - \Delta \pi}{\mu \times R_{total}}$$

Where:

  • $J$ = permeate flux (m/s or LMH)
  • $\Delta P$ = transmembrane pressure (TMP) (bar)
  • $\Delta \pi$ = osmotic pressure difference (bar), usually <0.1 bar for wastewater
  • $\mu$ = dynamic viscosity (Pa·s)
  • $R_{total}$ = total hydraulic resistance (m⁻¹)

For wastewater UF, $\Delta \pi$ is often negligible (<0.05 bar), so simplified form applies:

$$J = \frac{\Delta P}{\mu \times R_{total}}$$

Resistance-in-Series Model ​

$$R_{total} = R_m + R_p + R_{gel} + R_{irr}$$

Where:

  • $R_m$ = membrane resistance (m⁻¹), intrinsic
  • $R_p$ = pore blocking resistance (m⁻¹)
  • $R_{gel}$ = gel layer resistance (m⁻¹), concentration polarization
  • $R_{irr}$ = irreversible fouling (m⁻¹), removed by CIP only

Typical values for UF (wastewater):

  • $R_m$ = 5-15 × 10¹¹ m⁻¹ (tighter than MF)
  • $R_p$ = 2-10 × 10¹¹ m⁻¹ (internal pore fouling)
  • $R_{gel}$ = 5-20 × 10¹¹ m⁻¹ (removed by backwash)
  • $R_{irr}$ = 3-15 × 10¹¹ m⁻¹ (accumulates over time)

Molecular Weight Cut-Off (MWCO) ​

MWCO is the molecular weight (in Daltons) at which 90% of solutes are rejected:

$$MWCO = MW_{90% \text{ rejection}}$$

Relationship to pore size (empirical):

$$d_p [\text{nm}] \approx 0.033 \times MWCO^{0.46}$$

Examples:

  • MWCO 10 kDa → pore size ≈ 2.5 nm
  • MWCO 100 kDa → pore size ≈ 5.5 nm
  • MWCO 300 kDa → pore size ≈ 9 nm

Rejection Coefficient ​

Fraction of solute retained by membrane:

$$R = 1 - \frac{C_p}{C_f}$$

Where:

  • $C_p$ = permeate concentration
  • $C_f$ = feed concentration

Typical rejection:

  • Particles >0.01 μm: R ≈ 1.0 (100%)
  • Macromolecules >MWCO: R > 0.9 (>90%)
  • Macromolecules <MWCO: R < 0.1 (<10%)
  • Dissolved salts (TDS): R ≈ 0 (no rejection)

Concentration Polarization and Gel Layer ​

Rejected solutes accumulate at membrane surface:

$$C_{wall} = C_{bulk} \times \exp\left(\frac{J}{k}\right)$$

Where:

  • $C_{wall}$ = concentration at membrane surface
  • $C_{bulk}$ = bulk feed concentration
  • $k$ = mass transfer coefficient (m/s), typically 1-5 × 10⁻⁵ m/s

Critical flux: When $C_{wall}$ reaches gel concentration ($C_{gel}$), a gel layer forms, drastically increasing resistance.

$$J_{critical} = k \times \ln\left(\frac{C_{gel}}{C_{bulk}}\right)$$

Design principle: Operate below $J_{critical}$ to minimize fouling.

Hermia Fouling Models ​

Four mechanisms of flux decline:

  1. Complete blocking: $\frac{1}{J} = \frac{1}{J_0} + k_b \times t$
  2. Intermediate blocking: $\frac{1}{\sqrt{J}} = \frac{1}{\sqrt{J_0}} + k_i \times t$
  3. Standard blocking (pore constriction): $\frac{1}{J^2} = \frac{1}{J_0^2} + k_s \times t$
  4. Cake filtration: $\frac{1}{J^2} = \frac{1}{J_0^2} + k_c \times t$

For wastewater UF, cake filtration typically dominates.

Temperature Correction ​

Same as MF:

$$J_T = J_{20} \times 1.03^{(T-20)}$$

Example:

J₂₀ = 60 LMH @ 20°C
J₁₀ = 60 × 1.03⁻¹⁰ = 44.5 LMH @ 10°C (26% reduction)

Design Parameters ​

Input Parameters ​

ParameterSymbolUnitRangeDefaultDescription
MWCO-kDa10-300100Molecular weight cut-off
Pore size (equivalent)$d_p$nm2-105Nominal pore diameter
Design flux$J$LMH30-10060Net flux (averaged)
Operating TMP$\Delta P$bar0.5-2.01.0Transmembrane pressure
Temperature$T$°C5-3015Feed water temperature
Filtration cycle$t_f$min20-6040Time between backwashes
Backwash duration$t_{BW}$s30-9060Backwash time
Backwash flux$J_{BW}$LMH150-250200Reverse flux
CEB frequency-cycles12-4824BW cycles between CEB
CIP frequency-days30-12060Days between CIP
Feed TSS-mg/L2-2010Influent suspended solids
Feed COD-mg/L20-10050Chemical oxygen demand

Output Parameters ​

ParameterUnitDescription
Membrane aream²Required membrane surface area
Number of modules-Membrane elements
Permeate turbidityNTUEffluent turbidity (<0.05 typical)
Permeate CODmg/LOrganics in permeate
TMP @ end of cyclebarMaximum TMP before backwash
Net water production%Recovery accounting for backwash
Backwash volumem³/dDaily backwash water
CIP chemical cost$/yearNaOCl + citric acid + caustic
Energy consumptionkWh/m³Pumping energy
Log removal viruslog₁₀Validated viral removal (4-6 log)

Configuration Guide ​

Step-by-Step Setup ​

  1. Select MWCO and Pore Size

    Based on application:

    RO pretreatment: 100-150 kDa (balance flux and SDI reduction)
    Drinking water (virus barrier): 30-100 kDa (validated 4-log virus)
    Direct potable reuse: 30-50 kDa (tight, conservative)
    Color removal: 10-30 kDa (remove humic substances, low flux)
    Protein recovery: 10-50 kDa (based on target protein size)
    
    Typical wastewater: MWCO 100 kDa (pore ~5 nm)
  2. Determine Design Flux

    Conservative to minimize fouling:

    Secondary effluent (MBR): J = 15-25 LMH (submerged)
    Tertiary effluent (external pressure): J = 50-80 LMH
    RO pretreatment: J = 60-100 LMH (good feed quality)
    High-fouling feed: J = 30-50 LMH
    
    Recommendation for wastewater: J = 60 LMH (below critical flux)
  3. Calculate Membrane Area

    $$A = \frac{Q}{J \times R_{net}}$$

    Example:
    Q = 5,000 m³/d = 208 m³/h
    J = 60 LMH
    R_net = 0.93 (7% backwash loss)
    
    A = 208 / (60 × 0.93) = 3,727 m²
  4. Select Membrane Configuration

    Common types:

    • Hollow fiber (inside-out): Most common, 30-60 m²/module
    • Hollow fiber (outside-in): Better for high-fouling feeds
    • Spiral wound: Less common for UF, 30-40 m²/module
    • Tubular: High cost, easy to clean, industrial applications
    Using hollow fiber (inside-out) @ 50 m²/module:
    Modules = 3,727 / 50 = 75 modules
    
    Organize: 3 trains × 25 modules = 75 total
    (Allow 1 train offline for maintenance, operate at 66% capacity)
  5. Design Backwash System

    t_filtration = 40 minutes
    t_backwash = 60 s
    J_BW = 200 LMH (reverse flux)
    
    Backwash volume per cycle:
    V_BW = 3,727 × 200 × (1/60) = 12,423 L = 12.4 m³
    
    Cycles per day = 24 × 60 / 41 = 35.1
    Daily BW = 35.1 × 12.4 = 435 m³/d
    
    Backwash % = 435 / 5,000 = 8.7%
    Net recovery = 91.3% ✓
  6. CEB (Chemically Enhanced Backwash)

    Frequency: Every 24 cycles (once per day)

    Chemicals:

    • NaOCl: 100-200 ppm (organic/biological fouling)
    • Citric acid: 1000-2000 ppm (mineral scaling)
    • NaOH (optional): 0.1-0.3% (protein/oil fouling)

    Procedure:

    • Backwash with NaOCl (10 min soak)
    • Rinse
    • Backwash with acid (10 min soak)
    • Rinse
    • Return to service
  7. CIP (Clean-in-Place)

    Frequency: Every 60 days or when TMP increases 30%

    Chemicals:

    • NaOCl: 500-1000 ppm (1-3 hour soak)
    • Citric acid or HCl: 1-2% (1-3 hour soak)
    • NaOH: 0.5-1.0% (1-3 hour soak, for organics)

    Procedure:

    • Caustic soak (if organic fouling)
    • Rinse thoroughly
    • Acid soak (mineral scaling)
    • Rinse thoroughly
    • NaOCl soak (biofouling, final sanitization)
    • Rinse and integrity test
  8. Calculate Energy Consumption

    Feed pump:

    ΔP_total = TMP + ΔP_piping = 1.0 + 0.4 = 1.4 bar
    Q_feed = 5,000 / 0.913 = 5,477 m³/d = 228 m³/h
    
    Power = (228 × 1.4 × 10⁵) / (0.75 × 3600) = 11.8 kW
    Daily energy = 11.8 × 24 = 283 kWh/d
    Specific energy = 283 / 5,000 = 0.057 kWh/m³

    Backwash pump:

    Q_BW = 3,727 × 200 / 1000 = 745 m³/h
    ΔP_BW = 1.5 bar
    Power_BW = (745 × 1.5 × 10⁵) / (0.75 × 3600) = 41.4 kW
    Daily hours = 35.1 × (1/60) = 0.585 h
    Daily energy_BW = 41.4 × 0.585 = 24.2 kWh/d
    
    Total specific energy = (283 + 24.2) / 5,000 = 0.061 kWh/m³

Typical Design Values ​

ApplicationMWCO (kDa)Flux (LMH)TMP (bar)Recovery (%)Backwash (min)CIP (days)
Drinking water (virus barrier)30-5050-800.8-1.592-9630-6060-90
RO pretreatment100-15060-1001.0-2.093-9730-5060-120
Direct potable reuse30-10040-700.8-1.590-9530-6030-60
Industrial wastewater50-10030-601.0-1.888-9320-4030-60
MBR (submerged)100-20015-300.1-0.595-9810-2030-90

Performance Criteria ​

Removal Efficiency ​

ParameterInfluentPermeateRemoval
Turbidity1-5 NTU<0.05 NTU>99.5%
TSS5-20 mg/L<0.5 mg/L>99%
Bacteria (E. coli)10⁴-10⁶ cfu/100mL<1 cfu/100mL>6 log (validated)
Viruses10³-10⁵ PFU/100mL<10 PFU/100mL4-6 log (validated LRV)
Giardia/CryptoPresentNot detected>6 log
TOC (>MWCO)PartialReduced 20-50%20-50% (MW-dependent)
CODVariableReduced 10-40%10-40%
Color (humic acids)VariableReduced 40-80%40-80% (MWCO-dependent)
TDSNo removalNo removal0%

Virus Log Removal Validation ​

Critical for drinking water and reuse:

Challenge testing:

  • MS2 coliphage (27 nm, MWCO 100 kDa → >5 log)
  • ΦX174 bacteriophage (25 nm → >4 log)
  • Direct removal testing or surrogate correlation

Integrity testing:

  • Pressure decay test: Detect defects >0.05 μm
  • Acoustic sensor: Detect fiber breaks (advanced)

Acceptance criteria:

  • LRV validation: >4 log for viruses (regulatory requirement)
  • Permeate turbidity: <0.05 NTU
  • Pressure decay: ❤️ mbar/min

Comparison to MF ​

FactorMF (0.4 μm)UF (100 kDa, ~5 nm)
Bacteria removal>6 log>6 log
Virus removal0-2 log4-6 log ✓
Turbidity<0.1 NTU<0.05 NTU
Macromolecule removalNonePartial (>100 kDa) ✓
TMP0.1-0.5 bar0.5-2 bar
Flux80-120 LMH50-80 LMH
Fouling rateLowerHigher
Energy0.02 kWh/m³0.05-0.08 kWh/m³
CostLowerHigher

Selection: Use UF when virus removal or macromolecule rejection required, otherwise MF is more economical.

Troubleshooting ​

IssueCauseSolution
Rapid TMP increase (fouling)Operating above critical fluxReduce flux to <80% of critical
High protein/polysaccharide contentAdd caustic to CEB, increase frequency
Gel layer formationLower flux, improve crossflow (if applicable)
Irreversible pore blockingCIP with caustic + oxidizer
Flux decline not recovered by BWPore adsorption (irreversible)CIP with NaOH (protein) or NaOCl (organics)
Mineral scalingCIP with acid (citric or HCl)
Membrane agingReplace membranes (typically 5-7 years)
High permeate turbidity (>0.05 NTU)Fiber break or seal failureIntegrity test, isolate faulty module
Bypassing around moduleInspect O-rings, reseat module
Poor virus LRVMembrane integrity lossPressure decay test, replace damaged module
Flow bypassing membraneInspect all connections, manifold seals
Low flux even after CIPChemical incompatibility (damage)Review CIP chemicals vs. membrane material
Permanent fouling (aging)Plan membrane replacement
Operating beyond design lifeReplace membranes (5-7 year typical life)
High COD in permeateMWCO too high for target organicsUse tighter membrane (lower MWCO)
Membrane degradationIntegrity test, check for chlorine attack
Color breakthroughHumic acids <MWCOUse MWCO 10-30 kDa for color removal
Excessive CIP frequency (<30 days)Flux too highReduce design flux by 20-30%
Poor pretreatmentAdd upstream filtration or coagulation
Biological foulingIncrease CEB frequency, chlorination

Operation & Maintenance ​

Continuous Monitoring (SCADA) ​

  • Permeate flow rate (each train)
  • TMP (trend analysis critical)
  • Permeate turbidity (alarm at 0.05 NTU)
  • Feed and permeate pressure
  • Temperature (flux correction)
  • Backwash cycle counting
  • CEB/CIP chemical levels

Daily Checks ​

  • Review TMP trend (flag if >5%/week increase)
  • Verify permeate turbidity <0.05 NTU
  • Check backwash effectiveness (TMP recovery)
  • Inspect for leaks or module damage
  • Verify chemical tanks filled (CEB/CIP)
  • Review flux vs. design

Weekly Maintenance ​

  • Integrity test (pressure decay or bubble point)
  • Calibrate turbidity and pressure sensors
  • Inspect membrane modules (visual)
  • Review normalized TMP (correct for temperature)
  • Particle count testing (if required for reuse)
  • Clean pre-filters/strainers

Monthly Tasks ​

  • Performance audit (flux, TMP, recovery)
  • Virus LRV testing (if required for potable reuse)
  • CEB effectiveness review (optimize chemicals)
  • Inspect backwash valves and pumps
  • Review chemical consumption
  • Plan CIP based on TMP trends

Quarterly/CIP Events ​

  • Full CIP protocol (caustic + acid + NaOCl)
  • Post-CIP integrity testing
  • Flux recovery validation (target: >90% of clean membrane)
  • Replace damaged modules
  • Calibrate all instruments
  • Membrane life assessment

Annual Tasks ​

  • Comprehensive performance review
  • Membrane autopsy (if fouling issues)
  • Replace O-rings and seals (preventive)
  • Challenge test for LRV (virus surrogate)
  • Review operating conditions and optimize
  • Cost-benefit analysis (chemical, energy, replacement)
  • Regulatory compliance audit (LRV validation)

Advanced Features ​

Critical Flux Determination ​

Flux stepping test:

  1. Start at low flux (J = 20 LMH)
  2. Increase flux stepwise (20 → 40 → 60 → 80 LMH)
  3. Monitor TMP at each step (30 min equilibration)
  4. $J_{critical}$ = flux where TMP begins rapid increase

Operating strategy: Design flux = 0.7-0.8 × $J_{critical}$

Variable Frequency Drive (VFD) Control ​

Maintain constant TMP throughout filtration cycle:

  • As membrane fouls, reduce flux automatically
  • Prevents excessive TMP stress on membrane
  • Extends membrane life

Forward Flush with Air Scour ​

For submerged UF (MBR configuration):

  • Coarse bubble aeration from below
  • Air flow: 0.3-0.5 Nm³/m²·h
  • Reduces gel layer, enables lower TMP
  • Combined with intermittent relaxation (no permeation, 1-2 min)

Two-Phase Cleaning (Gas-Liquid) ​

Inject air during backwash:

  • Creates turbulence in membrane pores
  • Dislodges internal fouling
  • More effective than water-only backwash

UF/NF Hybrid ​

Operate tight UF (MWCO 10-30 kDa) as "loose NF":

  • Partial salt rejection (10-30%)
  • Hardness removal (Ca²⁺, Mg²⁺): 20-50%
  • Color removal: 70-90%
  • Lower pressure than true NF (0.5-1.5 bar vs. 5-15 bar)

Worked Example ​

Given ​

  • Flow: 3,000 m³/d (drinking water application, virus barrier)
  • Feed: Filtered surface water, Turbidity = 1 NTU, TOC = 3 mg/L, Temp = 10°C
  • Requirement: 4-log virus removal (validated)
  • Target recovery: 94%

Solution ​

Step 1: Select Membrane MWCO

For 4-log virus removal: MWCO ≤ 50 kDa (validated)
Use MWCO = 50 kDa (pore size ≈ 4 nm)

Step 2: Determine Design Flux

Drinking water, low fouling: J₂₀ = 70 LMH

Temperature correction:
J₁₀ = 70 × 1.03⁻¹⁰ = 51.9 LMH
Use J = 50 LMH (conservative, below critical flux)

Step 3: Calculate Membrane Area

Q = 3,000 m³/d = 125 m³/h
Recovery = 0.94

A = 125 / (50 × 0.94) = 2,660 m²

Use A = 2,700 m² (1.5% margin)

Step 4: Module Selection

Hollow fiber UF @ 60 m²/module:
Modules = 2,700 / 60 = 45 modules

Configuration: 3 trains × 15 modules = 45 total
(Operate 2 trains minimum = 66% capacity during maintenance)

Step 5: Backwash Design

t_filtration = 50 minutes (extended cycle, low fouling)
t_backwash = 60 s
J_BW = 200 LMH

Backwash volume = 2,700 × 200 × (1/60) = 9,000 L = 9.0 m³/cycle

Cycles/day = 24 × 60 / 51 = 28.2
Daily BW = 28.2 × 9.0 = 254 m³/d

Backwash % = 254 / 3,000 = 8.5%
Net recovery = 91.5% (slightly below 94% target, but typical for UF)

Step 6: CEB and CIP

CEB: Daily (28 cycles)
Chemicals: 100 ppm NaOCl, 1000 ppm citric acid
Cost: Negligible (<$50/year)

CIP: Every 90 days
Chemicals: NaOCl (1000 ppm) + HCl (1%) + NaOH (0.5%)
Annual CIP cost: ~$500/year

Step 7: Energy Consumption

Feed pump:
ΔP = 1.2 + 0.5 = 1.7 bar (TMP + piping)
Q_feed = 3,000 / 0.915 = 3,279 m³/d = 137 m³/h
Power = (137 × 1.7 × 10⁵) / (0.75 × 3600) = 8.6 kW
Daily energy = 8.6 × 24 = 206 kWh/d

Backwash:
Q_BW = 2,700 × 200 / 1000 = 540 m³/h
Power_BW = (540 × 1.8 × 10⁵) / (0.75 × 3600) = 36.0 kW
Daily hours = 28.2 × (1/60) = 0.47 h
Daily energy_BW = 36.0 × 0.47 = 16.9 kWh/d

Total specific energy = (206 + 16.9) / 3,000 = 0.074 kWh/m³
Annual energy cost @ $0.12/kWh = 223 × 365 × 0.12 = $9,768/year

Step 8: Verify Performance

Virus LRV: >4 log ✓ (validated for 50 kDa UF)
Turbidity: 1 NTU → <0.05 NTU ✓
Recovery: 91.5% (acceptable for UF)
Energy: 0.074 kWh/m³ (reasonable)

References ​

  1. Crittenden, J.C. et al. (2012). MWH's Water Treatment, 3rd Ed., Ch. 11: Membranes.
  2. AWWA (2011). Water Quality and Treatment, 6th Ed., Ch. 11.3: Ultrafiltration.
  3. WEF (2018). Design of Municipal Wastewater Treatment Plants, MOP 8, 6th Ed., Ch. 17.
  4. US EPA (2005). Membrane Filtration Guidance Manual, EPA 815-R-06-009.
  5. Metcalf & Eddy (2014). Wastewater Engineering, 5th Ed., pp. 1203-1241.
  6. Judd, S. (2011). The MBR Book, 2nd Ed., Elsevier.
  7. Baker, R.W. (2012). Membrane Technology and Applications, 3rd Ed., Wiley, Ch. 4.