Flow to Full Treatment Control (Engineered Unit) ​

The inlet works control that holds the flow to full treatment and spills the rest. Its subject is a legal number — the consent — rather than a sized machine, and everything the unit does is measured against it.

Which simulation? Running this unit uses the client-side, PLC-style scan simulation in your browser, not the server-side biokinetic process simulation. See Which "simulation" this section is about.

Slugfft-flow-control
Name in the libraryFFT Flow Control (Engineered Unit)
CategoryProcess Units/engineered
Seededversion 0.1.0, maturity published
Interface points6 — inlet, to_treatment, to_storm, fft_spare, power, signals
Asked on drop15, the same list for a new and an existing installation
Editable setpoints16
Fault catalogue25 cases, filtered to what is fitted
Control loops8 generated graphs

What it models ​

An inlet chamber with a storm overflow weir and a modulating control device on the forward main, so that the flow passed to full treatment is held at the consented rate and everything above it goes over the weir.

The drawing it generates carries the inlet chamber with its level transmitter LT-x01 and high-high level switch LSHH-x01, the storm overflow weir with its own head transmitter LT-x02, the modulating device with its actuator and position transmitter ZT-x01, the metered forward main with FT-x01 and the hardwired forward-flow-high switch FSH-x01, the isolating valve, the control panel and the off-page connections.

The plant model integrated during a run is the chamber level, the flow the device passes at the head across it, the weir's head–discharge behaviour above the crest, the actuator's travel, and the instruments reading all of it — together with a compliance account: the volume passed above the consent, and the worst excess in any averaging window. "Did it hold the consent" is a question about an average, not an instant.

No new/existing axis. Unlike the first three units, this one deliberately has no new / existing parameter. The reference case states that new-versus-existing is not a configuration axis for this unit, and adding it would double the asserted configuration matrix. The drop panel therefore shows the same fifteen fields either way.

Key parameters ​

Asked on drop ​

ParameterUnitType
Population equivalent—number
Impermeable contributing aream²number
FFT derivation—consent formula / declared
FFT settingl/snumber
Aerobic volume of the works downstreamm³number
Declared accepted flow downstreaml/snumber
Inlet chamber plan aream²number
Storm weir crest above the floormnumber
Chamber wall crest above the floormnumber
Control method—modulating penstock and others
Flow meter—electromagnetic / flume
Forward flow meter fitted—yes / no
Storm destination—storm tank / watercourse
Storm weir crest lengthmnumber
Trunk DNmminteger

The fifteen are the whole budget: the catchment the consent is derived from, the consent itself and where it comes from, the works downstream that bound it, the chamber and its two critical levels, the device and the measurement, the storm split, and the forward main's governing bore. The template carries 55 parameters in total.

Editable setpoints ​

SetpointUnit
Flow to full treatment · Control deadband · Hardwired forward-flow-high trip · Cross-check absolute tolerancel/s
Flow loop gain% per l/s
Flow loop integral time · derivative time · Cross-check delay · Position deviation delay · Spill reporting delay · Compliance averaging windows
Minimum travel · Maximum travel · Permitted measurement uncertainty · Cross-check proportional tolerance%
Setpoint-hold band below the crestm

Eight of these (minimum and maximum travel, the permitted measurement uncertainty, the compliance averaging window, the two cross-check tolerances, the cross-check delay and the spill reporting delay) start from the rule set. An edit you make to any of them is kept: it stays in force when you close and reopen the installation, and the rule set fills only a value you have not set.

Control loops ​

Eight generated graphs:

Measurement health · FT versus position-implied flow · Chamber level · FFT flow control · Actuator and positioner · Storm detect and spare capacity · Hardwired protection · the outstation

Two of those deserve a word:

  • FT versus position-implied flow is a cross-check: the measured forward flow against what the device's travel implies it should be. Disagreement beyond the tolerance for longer than the delay is itself a finding — the point of a consent is that you can show you held it, and a meter you cannot corroborate does not show that.
  • Hardwired protection runs even when the PLC is not energised, and includes a forward-flow-high open-inhibit: it commands nothing, it only prevents the device opening further.

What the outputs mean ​

Published port values ​

PortWhat it publishes
inletDry weather flow and design peak on the diurnal profile
to_treatmentThe flow passed forward, with the loss through the forward main
to_stormThe spill at the design peak and at the extreme peak
fft_spareThe spare capacity under the consent, plus a storm flag — this is a published value, and it is what a storm tank downstream consumes to decide how fast it may return
powerkW, kVA, amps, essential load and largest start
signalsThe size of its signal set

For the reference configuration inlet reads 23.4375 l/s dry weather flow and 103.4375 l/s design peak; to_treatment 60.9375 l/s at 0.394167 m of main loss; to_storm 42.5000 l/s at the design peak and 122.5000 l/s at the extreme; fft_spare 37.5000 l/s at dry weather flow; power 0.370000 kW / 0.435294 kVA / 0.628293 A; and the signal set 11 DI / 2 DO / 4 AI / 1 AO plus 2 communications registers.

Two of those are run-derived. The forward flow actually achieved and the hours spent spilling come from a completed run. A freshly placed instance has not run anything, so those two fall back to the design-time figure and to absence respectively.

Overview figures ​

Control device, flow to full treatment, what downstream accepts, inflow (dry weather and design peak), spill (design and extreme peak), the breach flow and the compliance window, the chamber (area, weir crest, wall crest), maximum demand, design findings, control loops.

Live facts during a run ​

Titled Inlet works: the clock, the unit's mode, the chamber level with the transmitter's reading, inflow, forward flow (measured and actual), the setpoint against the breach flow, the device's travel, the spill, the consent excess, the published spare, and the state of the hardwired circuits.

Trend panels ​

Four: chamber level (with the LT reading dashed, and reference lines at the wall crest, the high-high switch, the weir crest and the hold band), forward flow (with the FT reading dashed, and reference lines at the consent and at the breach flow), spill rate, and device position.

The calculation charts ​

Two:

  • the device law — flow against travel, drawn at both ends of the operating band (the bottom of the band and the weir crest), with the consent marked across it and the duty travel where the crest curve meets it. The two curves are what make "the plant gain is not constant" a picture rather than a claim.
  • the storm weir curve — head against spill flow from the crest upwards.

Faults you can inject ​

GroupCases
Forward flow meter FT-x01signal lost · frozen · four drifts (−8 %, ±10 %, ±20 %)
Chamber level LT-x01signal lost · +0.50 m drift · a −0.50 m drift under a lost FT
Position feedback ZT-x01lost
The devicestuck mid-travel · failed open · failed shut in the storm · failed shut on a dry day
Supplythe actuator's own · the whole site's, for 2 h
HardwiredLSHH stuck operated / will not operate · FSH stuck operated / will not operate
The spill routethe weir blocked · the weir head transmitter lost
Setpointsthe deadband set to 10 % · the deadband set to 0 %

A configuration without the position transmitter drops its cases, and so on — the catalogue is filtered to what is fitted.

Honest limits ​

  • Seeded at published maturity: its configuration matrix passed, so it is visible to every user who passes the plan, tenant and allocation gates.
  • The itemised fittings of the forward main are not parameterisable yet.
  • Tag builders carry an area placeholder (LT-x01), so two installations on one drawing will not take distinct tag numbers.
  • The run verdict and the design findings are shown on the workspace's Validation view.
  • Nobody has recorded watching this unit run in a browser.