Skip to content

Chlorination ​

Chlorine gas or sodium hypochlorite disinfection achieving 4-log pathogen reduction through CT-based contact tank design with residual monitoring and chloramine formation control.

Overview ​

Chlorination is the most widely used disinfection method in wastewater treatment, providing reliable pathogen inactivation through oxidative damage to cell membranes and genetic material. While effective and economical, chlorination requires careful management of contact time, residual chlorine measurement, and dechlorination to protect aquatic life.

When to Use ​

  • Primary disinfection for effluent discharge (regulatory compliance)
  • Fecal coliform reduction to <200 cfu/100mL (UK) or <1000 cfu/100mL (US)
  • Combined with UV for robust multi-barrier approach
  • Process control (slime/odor control in collection systems)
  • Peak wet weather disinfection (simpler than UV)
  • Combined sewer overflow (CSO) treatment

Key Characteristics ​

  • Log reduction: 4-6 log bacteria, 2-4 log viruses, 2-3 log protozoa (Giardia)
  • Residual maintained: 0.5-2.0 mg/L free chlorine
  • Contact time: 15-30 minutes @ peak flow
  • CT requirement: 15-450 mg·min/L (species and pH dependent)
  • Temperature sensitivity: Higher CT required at low T
  • Dechlorination required: Sodium bisulfite or sulfur dioxide
  • Trihalomethane (THM) formation risk

Operating Modes ​

Basic Mode ​

  • Fixed dose control
  • Simple plug-flow contact tank
  • Time-based CT calculation
  • Manual residual adjustment
  • Default CT value for E. coli (450 mg·min/L @ pH 7, 10°C)

Advanced Mode ​

  • Chick-Watson kinetic model
  • Variable dose based on ammonia nitrogen (chloramine formation)
  • Baffle factor correction (short-circuiting)
  • Temperature-corrected CT values
  • Multi-species pathogen inactivation
  • DBP (disinfection byproduct) prediction
  • Automatic dechlorination control

Mathematical Model ​

Chick-Watson Inactivation Kinetics ​

The fundamental equation for disinfection:

$$\ln\left(\frac{N}{N_0}\right) = -k' \times C^n \times t$$

Or in log₁₀ form:

$$\log\left(\frac{N}{N_0}\right) = -\frac{k' \times C^n \times t}{2.303}$$

Where:

  • $N$ = pathogen concentration after disinfection (count/100mL)
  • $N_0$ = initial pathogen concentration (count/100mL)
  • $k'$ = specific lethality coefficient (L/(mg·min) for n=1)
  • $C$ = disinfectant concentration (mg/L)
  • $n$ = coefficient of dilution (typically 0.86-1.0 for chlorine)
  • $t$ = contact time (min)

Simplified form (n=1):

$$\log\left(\frac{N}{N_0}\right) = -k \times CT$$

Where $CT$ = concentration × time (mg·min/L)

CT Concept (Concentration × Time) ​

The CT value represents disinfection "dose":

$$CT_{required} = C_{residual} \times t_{contact}$$

Actual CT (accounting for short-circuiting):

$$CT_{actual} = C_{residual} \times t_{10} \times BF$$

Where:

  • $t_{10}$ = time for 10% of tracer to pass through tank (min)
  • $BF$ = baffle factor = $t_{10} / t_{theoretical}$ (dimensionless, 0.3-0.7)

UK CT Values for Free Chlorine (DWI Standards) ​

4-log Giardia cyst inactivation at 10°C:

pHCT (mg·min/L)
6.042
6.553
7.079
7.5110
8.0155
8.5220
9.0310

US EPA CT Tables (SWTR):

For 99.9% (3-log) Giardia inactivation @ pH 7.0:

Temperature (°C)CT (mg·min/L)
0.5165
5117
1088
1570
2058
2548

For E. coli (typical wastewater target):

  • 99.99% (4-log) inactivation: CT ≈ 15-30 mg·min/L @ pH 7, 15°C

Temperature Correction ​

$$CT_T = CT_{20} \times \theta^{(20-T)}$$

Where:

  • $\theta$ = temperature coefficient (1.02-1.05 for chlorine, typically 1.03)
  • $T$ = actual temperature (°C)

Chlorine Demand ​

Chlorine is consumed by:

  1. Ammonia (chloramine formation)
  2. Organic matter (oxidation)
  3. Reduced metals (Fe²⁺, Mn²⁺)
  4. Sulfides

$$C_{applied} = C_{demand} + C_{residual}$$

Chloramine formation (breakpoint chlorination):

$$NH_3 + HOCl \rightarrow NH_2Cl + H_2O \quad \text{(monochloramine)}$$

$$NH_2Cl + HOCl \rightarrow NHCl_2 + H_2O \quad \text{(dichloramine)}$$

Breakpoint:

$$2NH_3 + 3HOCl \rightarrow N_2 + 3HCl + 3H_2O$$

Cl₂:N mass ratio for breakpoint ≈ 7.6:1 to 10:1

Disinfection Byproduct Formation (DBPs) ​

Trihalomethanes (THMs):

$$\text{Organic precursors} + Cl_2 \rightarrow CHCl_3, CHBrCl_2, CHBr_2Cl, CHBr_3$$

Empirical model:

$$THM = k_{THM} \times C_{Cl_2} \times TOC \times t \times f(pH, T)$$

Where:

  • $TOC$ = total organic carbon (mg/L)
  • $k_{THM}$ = empirical rate constant

Haloacetic acids (HAAs):

Similar formation mechanism, typically 0.5-1.5 times THM concentration.

Design Parameters ​

Input Parameters ​

ParameterSymbolUnitRangeDefaultDescription
Flow rate$Q$m³/d--Design flow (peak hourly)
Contact time$t$min15-9030Hydraulic retention time
Target CT$CT$mg·min/L15-45080Design CT value
Baffle factor$BF$-0.3-0.70.5Short-circuit correction
Chlorine dose$D$mg/L2-155Applied chlorine dose
Target residual$C_r$mg/L0.5-2.01.0Free chlorine residual
Influent NH₃-N$NH_3$mg/L0-302Ammonia nitrogen
Influent BOD₅$BOD$mg/L5-3015Biochemical oxygen demand
Temperature$T$°C5-2515Wastewater temperature
pH--6.5-8.57.2Wastewater pH

Output Parameters ​

ParameterUnitDescription
Tank volumem³Contact tank volume
Tank dimensionsmLength × width × depth
Chlorine demandkg Cl₂/dTotal chlorine consumption
t₁₀ timemin10% tracer passage time
Actual CTmg·min/LAchieved disinfection dose
Log reductionlog₁₀Pathogen inactivation
Dechlorination dosekg SO₂/dSodium bisulfite required
Chemical cost$/yearAnnual chlorine + dechlorination

Configuration Guide ​

Step-by-Step Setup ​

  1. Determine Design CT Value

    Based on regulatory requirements:

    UK - Surface water discharge: CT ≥ 80 mg·min/L (Giardia 4-log @ pH 7, 10°C)
    US - Secondary treatment: 450 mg·min/L (E. coli limit, conservative)
    US - Advanced treatment: Based on state requirements
    
    Typical selection:
    - Urban river discharge: CT = 80-150 mg·min/L
    - Recreational water: CT = 150-300 mg·min/L
    - Water reuse: CT = 300-450 mg·min/L (often combined with UV)
  2. Select Contact Time

    Minimum contact time from regulations:

    • UK: t₁₀ ≥ 30 minutes @ peak flow
    • US: Modal contact time ≥ 90 minutes (conservative)
    Practical design:
    t_theoretical = 30 minutes (common)
    Assume BF = 0.5 (serpentine baffled tank)
    t_10 = BF × t_theoretical = 0.5 × 30 = 15 minutes
  3. Calculate Required Residual

    $$C_{residual} = \frac{CT_{required}}{t_{10}}$$

    Example:
    CT_required = 80 mg·min/L
    t_10 = 15 min
    
    C_residual = 80 / 15 = 5.3 mg/L
    
    (This is HIGH - need to increase contact time or accept lower CT)
    
    Better design:
    t_theoretical = 45 min, BF = 0.6 → t_10 = 27 min
    C_residual = 80 / 27 = 3.0 mg/L ✓
  4. Design Contact Tank Volume

    $$V = \frac{Q \times t_{theoretical}}{60}$$

    Q = 10,000 m³/d = 417 m³/h (average)
    Q_peak = 2.5 × Q_avg = 1042 m³/h (peak factor 2.5)
    
    Use peak flow for design:
    V = 1042 × (45/60) = 781 m³
    
    Round up: V = 800 m³
  5. Design Tank Geometry

    Serpentine baffle configuration for BF = 0.6:

    • Length:Width ratio ≥ 20:1 (with baffles)
    • Depth: 3-5 m (typically 4m)
    • Number of passes: 6-10
    V = 800 m³
    Depth = 4m
    Horizontal area = 800 / 4 = 200 m²
    
    For L:W = 25:1 (effective with baffles):
    L × W = 200 m²
    L = 25W
    25W² = 200 → W = 2.83 m
    L = 70.8 m
    
    Design: 71m long × 2.8m wide × 4m deep
    Number of passes: 8 (each pass 8.9m long)
  6. Calculate Chlorine Demand

    Breakpoint curve method:

    If NH₃-N = 2 mg/L, need Cl₂:N ≈ 10:1 for breakpoint:

    $$Dose_{breakpoint} = 10 \times 2 = 20 \text{ mg/L Cl}_2$$

    Practical approach (empirical):

    $$Dose = Demand + Residual$$

    Typical demand for secondary effluent: 3-8 mg/L
    Assume 5 mg/L demand
    Residual needed: 3.0 mg/L
    
    Total dose = 5 + 3 = 8 mg/L Cl₂
  7. Calculate Chlorine Consumption

    $$M_{Cl_2} = Q \times Dose \times 10^{-3}$$

    Q = 10,000 m³/d
    Dose = 8 mg/L
    
    M_Cl₂ = 10,000 × 8 × 10⁻³ = 80 kg Cl₂/day
    
    Annual = 80 × 365 = 29,200 kg/year
    
    If using 12% NaOCl:
    NaOCl consumption = 29,200 / 0.12 = 243,333 kg/year = 243 tonnes/year
  8. Design Dechlorination System

    Residual after contact tank ≈ 3.0 mg/L, must reduce to <0.01 mg/L for discharge.

    Sodium bisulfite (NaHSO₃):

    $$NaHSO_3 + Cl_2 + H_2O \rightarrow NaHSO_4 + 2HCl$$

    Stoichiometric ratio: 1.46 kg NaHSO₃ per kg Cl₂

    Residual to remove = 3.0 mg/L
    Dose = 1.46 × 3.0 = 4.4 mg/L NaHSO₃
    
    Daily consumption = 10,000 × 4.4 × 10⁻³ = 44 kg/d
    Annual = 16,060 kg/year

Typical Design Values ​

ApplicationContact Time (min)Chlorine Dose (mg/L)Residual (mg/L)CT (mg·min/L)Dechlorination
Secondary effluent (UK)30 (t₁₀=15)5-82-380-100Required
Secondary effluent (US)90 (modal)8-155-8450+Required
Peak wet weather15 (t₁₀=8)10-153-540-60Sometimes waived
CSO treatment5-10 (flash mix)15-255-1025-100Sometimes waived
Process controlVariable2-50.5-2N/ANot required

Performance Criteria ​

Pathogen Inactivation ​

OrganismCT for 99.9% (3-log) @ pH 7, 15°CCT for 99.99% (4-log)
E. coli0.05 mg·min/L0.08 mg·min/L
Fecal coliforms0.1 mg·min/L0.15 mg·min/L
Enteric viruses3-12 mg·min/L6-24 mg·min/L
Giardia cysts45-150 mg·min/L90-300 mg·min/L
Cryptosporidium7,200 mg·min/L (ineffective)>15,000 mg·min/L

Note: Cryptosporidium is highly resistant to chlorine. UV or ozone required for effective inactivation.

Effect of pH on Efficacy ​

Hypochlorous acid (HOCl) is 80-100× more effective than hypochlorite ion (OCl⁻).

Speciation:

$$HOCl \leftrightarrow H^+ + OCl^-$$

pKₐ ≈ 7.5 @ 20°C

pH% HOCl% OCl⁻Relative Efficacy
6.0973100%
7.0762488%
7.5505060%
8.0247635%
9.03978%

Practical implication: Disinfection at pH 8-9 requires 3-5× higher CT than pH 6-7.

Residual Chlorine Limits ​

Aquatic toxicity:

  • Acute toxicity (96h LC₅₀): 0.01-0.5 mg/L for most fish species
  • Chronic effects: <0.002 mg/L (salmonids very sensitive)

Regulatory limits (effluent discharge):

  • UK (Freshwater Fish Directive): <0.01 mg/L total residual
  • US EPA: Varies by state, typically <0.011 mg/L (4-day average)
  • California: <0.02 mg/L (1-hour average)

Conclusion: Dechlorination is almost always required for surface water discharge.

Troubleshooting ​

IssueCauseSolution
Inadequate disinfection (high fecal coliforms)Low chlorine doseIncrease dose, verify residual
Short-circuiting in tankImprove baffling, tracer study
High ammonia (chloramine formation)Increase dose to breakpoint
pH too high (OCl⁻ predominates)Adjust pH to 6.5-7.5 if possible
Low contact timeReduce flow or add tank volume
Interfering substances (organics)Improve upstream treatment
High chlorine demandAmmonia in effluentNitrify upstream, increase dose
High BOD (organic matter)Improve secondary treatment
Reduced metals (Fe²⁺, Mn²⁺)Pre-oxidation or filtration
Sulfides (septic conditions)Aeration, odor control
Residual breakthrough (in effluent)Dechlorination system failureCheck SO₂ feed, increase dose
Inadequate mixingImprove dechlorination mixing
Flow surgeAdd flow pacing, buffer tank
High THM/HAA formationHigh TOC in influentReduce contact time, lower dose
High temperatureSeasonal adjustment
High pH (for HAAs)pH adjustment
Chlorine gas leakEquipment failureEmergency shutdown, evacuate, ventilate
Overpressure in storageInspect relief valves, temperature control
Variable residualFlow variationFlow-paced dosing control
Demand variationAmmonia monitoring, feedback control

Operation & Maintenance ​

Daily Checks ​

  • Measure chlorine residual (manual DPD test or online analyzer)
  • Verify chlorine feed rate and storage level
  • Check dechlorination system operation
  • Monitor effluent fecal coliform (if online monitor available)
  • Inspect contact tank for short-circuiting (surface observation)
  • Verify no chlorine odor at discharge point

Weekly Maintenance ​

  • Calibrate online chlorine analyzers (free vs. total)
  • Lab confirmation of residual chlorine
  • Collect fecal coliform samples for lab analysis
  • Inspect chlorine injectors and diffusers
  • Check dechlorination chemical storage
  • Verify contact tank water level and flow distribution

Monthly Tasks ​

  • Conduct tracer study (if issues suspected) to verify t₁₀
  • Measure CT profile (residual at multiple points in tank)
  • Inspect baffles for integrity
  • Clean chlorine analyzer probe
  • Review chlorine consumption trends
  • Check for THM/HAA formation (if required)
  • Inspect chlorine storage (gas cylinders or hypochlorite tank)

Annual Tasks ​

  • Full tracer study (rhodamine dye) to determine baffle factor
  • Structural inspection of contact tank
  • Chlorine system safety audit
  • Emergency response drill (chlorine leak)
  • Review design vs. actual performance
  • Optimize dosing strategy based on seasonal patterns
  • THM/HAA compliance testing (if discharge to sensitive water)

Advanced Features ​

Flow-Paced Chlorine Dosing ​

Automatically adjust dose based on flow:

$$Dose_{Cl_2}(t) = \frac{Q(t) \times C_{setpoint}}{Q_{design}}$$

Prevents overdosing at low flow and underdosing at high flow.

Ammonia-Based Dosing (Breakpoint Control) ​

Monitor NH₃-N online and dose to breakpoint:

$$Dose = 10 \times NH_3\text{-N} + C_{residual}$$

Ensures free chlorine residual even with variable ammonia.

Compound Loop Control ​

  1. Measure residual at end of contact tank
  2. Compare to setpoint (e.g., 1.0 mg/L free Cl₂)
  3. Adjust dose using PID controller
  4. Account for lag time (contact time delay)

DBP Minimization Strategies ​

  1. Reduce contact time: Meet CT requirement but no excess
  2. Optimize dose: Lower dose + longer time vs. higher dose + shorter time
  3. pH control: Lower pH (6.5-7.0) reduces HAA formation
  4. Pre-filtration: Remove organic precursors before chlorination
  5. Alternative point of application: Chlorinate after filtration instead of before

Alternative Chlorine Sources ​

SourceAvailable Cl₂AdvantagesDisadvantages
Chlorine gas (Cl₂)100%Low cost, highly effectiveSafety risk, complex storage
Sodium hypochlorite (NaOCl)12-15%Safe, easy handlingHigher cost, degrades in storage
Calcium hypochlorite (Ca(OCl)₂)65-70%Stable solid, safeAdds calcium, requires dissolution
On-site generation (electrochlorination)0.4-0.8%Eliminates transport, safeHigh capital, energy intensive

Worked Example ​

Given ​

  • Flow: 8,000 m³/d average, 20,000 m³/d peak (storm event)
  • Design for peak flow
  • Target: E. coli <1000 cfu/100mL (99.99% reduction from 10⁷)
  • Secondary effluent: NH₃-N = 3 mg/L, BOD₅ = 15 mg/L, pH = 7.2, T = 12°C
  • Regulatory requirement: CT ≥ 80 mg·min/L

Solution ​

Step 1: Select Contact Time

Use t_theoretical = 40 minutes @ peak flow
Assume well-baffled tank: BF = 0.6
t_10 = 0.6 × 40 = 24 minutes

Step 2: Calculate Required Residual

CT_required = 80 mg·min/L
C_residual = CT / t_10 = 80 / 24 = 3.3 mg/L free Cl₂

Step 3: Estimate Chlorine Demand

Ammonia demand (to breakpoint): 10 × 3 = 30 mg/L (too high)
Alternative: Accept chloramine formation, dose beyond breakpoint
Practical demand for secondary effluent @ 12°C: 6 mg/L

Total dose = Demand + Residual = 6 + 3.3 = 9.3 mg/L
Use 10 mg/L for design safety margin

Step 4: Design Contact Tank

Q_peak = 20,000 m³/d = 833 m³/h
V = 833 × (40/60) = 555 m³

Use V = 600 m³ (allow 8% safety factor)

Tank geometry:
Depth = 4.5 m
Area = 600 / 4.5 = 133 m²

For L:W = 30:1 (serpentine):
L = 63 m, W = 2.1 m
Number of passes: 9 (each 7m long)

Step 5: Verify Performance

Actual CT = 3.3 mg/L × 24 min = 79.2 mg·min/L ✓ (meets 80 target)

For E. coli (CT requirement ≈ 0.08 mg·min/L for 4-log):
Log reduction = 79.2 / 0.08 = 990× more than required
Expect >6-log reduction ✓

Step 6: Chemical Consumption

Chlorine:
Daily (avg flow) = 8,000 × 10 × 10⁻³ = 80 kg Cl₂/d
Annual = 29,200 kg/year

Using 12% NaOCl:
NaOCl = 29,200 / 0.12 = 243,333 kg/year = 243 tonnes
Cost @ $500/tonne = $121,650/year

Dechlorination (assume 3 mg/L residual to remove):
NaHSO₃ dose = 1.46 × 3 = 4.4 mg/L
Daily = 8,000 × 4.4 × 10⁻³ = 35.2 kg/d
Annual = 12,848 kg/year
Cost @ $800/tonne = $10,278/year

Total chemical cost = $131,928/year

References ​

  1. White, G.C. (2010). White's Handbook of Chlorination and Alternative Disinfectants, 5th Ed., Wiley.
  2. US EPA (1999). Disinfection Profiling and Benchmarking Guidance Manual, EPA 815-R-99-013.
  3. WEF (2018). Design of Municipal Wastewater Treatment Plants, MOP 8, 6th Ed., Ch. 18.
  4. Metcalf & Eddy (2014). Wastewater Engineering, 5th Ed., pp. 1347-1402.
  5. Drinking Water Inspectorate (UK) (2022). Guidance on the Water Supply (Water Quality) Regulations.
  6. AWWA (2011). Water Quality and Treatment, 6th Ed., Ch. 14: Disinfection.
  7. Crittenden, J.C. et al. (2012). MWH's Water Treatment, 3rd Ed., Ch. 19.