Phosphorus Balance ​

Tracking phosphorus through biological and chemical removal

Overview ​

Phosphorus balance tracks total phosphorus (TP) as it transforms through treatment. Understanding P pathways is essential for meeting increasingly stringent discharge limits.

Phosphorus Forms ​

Species ​

FormSymbolDescription
OrthophosphatePO4-PSoluble, reactive
PolyphosphatePoly-PStored in PAOs
Organic POrg-PBound in organics
Particulate PPart-PIn solids/biomass

Aggregate Parameters ​

ParameterComponents
TPAll P forms
SRPSoluble reactive P (≈PO4)
TSPTotal soluble P
TPPTotal particulate P

P Removal Mechanisms ​

Three Main Pathways ​

Phosphorus Removal
        │
        ├── 1. Biological (EBPR)
        │   └── PAO uptake → poly-P in sludge
        │
        ├── 2. Chemical Precipitation
        │   └── Metal salt → precipitate in sludge
        │
        └── 3. Biomass Assimilation
            └── Normal cell growth → P in sludge

Removal Fractions ​

MechanismTypical % of TP Removed
Assimilation20-30%
EBPR40-60%
Chemical10-30% (supplemental)

Biological P Removal (EBPR) ​

PAO Metabolism ​

Anaerobic Phase:

  • VFA uptake
  • P release (poly-P → PO4)
  • PHA storage

Aerobic Phase:

  • P uptake (luxury uptake)
  • PHA oxidation
  • Poly-P reformation

Key Requirements ​

ParameterRequirement
VFA>20 mg VFA/mg P removed
Anaerobic zone0.5-2 h HRT
No O2/NO3In anaerobic zone
Temperature>12°C
SRT5-25 days

P Content in Sludge ​

Sludge Type% P (dry basis)
Normal WAS2-3%
EBPR sludge5-7%
High EBPRUp to 10%

Chemical P Removal ​

Common Chemicals ​

ChemicalFormulaP Removal Mechanism
AlumAl2(SO4)3AlPO4 precipitate
Ferric chlorideFeCl3FePO4 precipitate
Ferrous sulfateFeSO4Fe3(PO4)2 precipitate
LimeCa(OH)2Ca3(PO4)2 precipitate

Dose Ratios ​

ChemicalMolar Ratiomg/mg P
Alum1.5-3.0 Al:P1.5-3.0
Ferric1.5-3.0 Fe:P2.7-5.4
Ferrous2.0-3.5 Fe:P3.6-6.3

Dose Points ​

LocationApplication
PrimaryPre-precipitation
RASConcurrent
Post-secondaryTertiary treatment

Mass Balance ​

Overall Balance ​

$$P_{in} = P_{effluent} + P_{sludge}$$

Component Tracking ​

StreamPO4-POrg-PPart-PTP
Influent4228
Anaerobic81.5110.5
Aerobic0.50.578
Effluent0.50.30.21.0
WAS---7.0

ErgoPlanner Configuration ​

Influent P ​

json
{
  "phosphorus": {
    "TP": 8,
    "PO4_P": 5,
    "organic_P": 2,
    "particulate_P": 1
  }
}

EBPR Settings ​

Configure anaerobic zone:

  • DO setpoint: 0 mg/L
  • No internal recycle to anaerobic
  • VFA fraction in influent

Chemical Dosing ​

json
{
  "chemical_P_removal": {
    "type": "FeCl3",
    "dose_point": "RAS",
    "target_effluent_P": 0.5,
    "molar_ratio": 2.0
  }
}

Example: A2O Process ​

Configuration ​

ParameterValue
Flow25,000 m³/d
Influent TP10 mg/L
Target TP<1 mg/L
VFA in influent50 mg/L

Zone Sizing ​

ZoneVolumeHRT
Anaerobic1,500 m³1.4 h
Anoxic2,500 m³2.4 h
Aerobic6,000 m³5.8 h

Results ​

ParameterValue
Effluent TP0.8 mg/L
P removal92%
Sludge P5.5%
Chemical backupNone needed

Troubleshooting ​

IssueCauseSolution
High effluent PLow VFAAdd fermenter, chemical
Unstable removalGAO competitionLower pH, temp
P release in clarifierAnaerobic conditionsReduce RAS retention
Declining EBPRToxic shockIdentify and remove

Monitoring ​

Key Parameters ​

ParameterFrequencyPurpose
Effluent TPDailyCompliance
Effluent PO4ContinuousControl
Anaerobic PWeeklyEBPR health
Sludge P %MonthlyEBPR efficiency
VFAWeeklyFeed characterization

Warning Signs ​

IndicatorConcern
Declining sludge P%EBPR deteriorating
High anaerobic PNormal, but monitor
Low VFAEBPR at risk
High secondary PClarifier release

Best Practices ​

  1. Maximize VFA - Primary fermentation helps
  2. Protect anaerobic zone - No O2 or NO3
  3. Control SRT - 5-15 days optimal for EBPR
  4. Minimize P release - Quick sludge handling
  5. Chemical backup - For upset conditions

References ​

  1. Barnard, J. "Biological P Removal"
  2. WEF MOP 34 "Nutrient Removal"
  3. Comeau, Y. "EBPR Mechanisms"