Skip to content

DAF Thickener (Dissolved Air Flotation) ​

Pressurized flotation system using micro-bubbles to float and concentrate low-density biological sludge from 0.5-1.5% to 4-6% dry solids.

Overview ​

DAF thickeners are highly effective for waste activated sludge (WAS), particularly from extended aeration systems with high SVI (150-300 mL/g). Micro-bubbles attach to sludge flocs, floating them to the surface where they are mechanically skimmed off as thickened float.

When to Use ​

  • Extended aeration WAS (MCRT >15 days, SVI >150)
  • Membrane bioreactor (MBR) sludge
  • Biological nutrient removal (BNR) sludge with denitrification
  • Industrial biological sludge (low-density, filamentous)
  • Combined WAS + primary (with polymer)
  • When footprint is limited

Key Characteristics ​

  • Excellent for high-SVI sludge (where gravity thickening fails)
  • Compact footprint (high surface loading rate)
  • Requires polymer addition
  • Higher operating cost than gravity thickening
  • Consistent underflow (float) concentration
  • Clarified subnatant quality excellent (<50 mg/L TSS)

Operating Modes ​

Basic Mode ​

  • Fixed air-to-solids ratio (A/S)
  • Simple polymer dose calculation
  • Default hydraulic loading rate

Advanced Mode ​

  • Dynamic A/S optimization based on feed characteristics
  • Real-time polymer dose adjustment
  • Pressure control for bubble size optimization
  • Recycle ratio modeling
  • Float solids prediction based on SVI and polymer dose

Mathematical Model ​

Governing Equation - DAF Loading ​

The key parameter is air-to-solids ratio (A/S):

$$\frac{A}{S} = \frac{1.3 \times S_a \times (f \times P - 1)}{S_s}$$

Where:

  • $A/S$ = air-to-solids ratio (kg air/kg solids)
  • $S_a$ = air solubility at 20°C and 1 atm = 19 mg/L
  • $f$ = saturation efficiency (0.5-0.9, typically 0.7)
  • $P$ = absolute pressure (bar), typically 4-6 bar gauge = 5-7 bar absolute
  • $S_s$ = solids concentration in DAF tank (kg/m³)

Typical A/S targets:

  • WAS: 0.02-0.04 kg air/kg solids
  • Primary + WAS: 0.01-0.03 kg air/kg solids

Recycle Rate ​

The recycle flow provides dissolved air:

$$Q_R = Q \times \frac{(A/S) \times S_s}{1.3 \times S_a \times (f \times P - 1)}$$

Where:

  • $Q_R$ = recycle flow rate (m³/h)
  • $Q$ = feed flow rate (m³/h)
  • Typical recycle ratio: 30-100% of feed flow

Surface Loading Rate ​

$$SLR_{DAF} = \frac{Q}{A_{DAF}}$$

Where:

  • $SLR_{DAF}$ = surface loading rate (m³/m²·h)
  • Typical range: 5-15 m/h (much higher than gravity thickeners)

Solids Loading Rate ​

$$SLR_{solids} = \frac{Q \times TSS}{A_{DAF}}$$

Typical range: 50-150 kg/m²·d

Float Concentration ​

$$C_{float} = \frac{Q \times TSS_{feed} \times \eta}{Q_{float}}$$

Where:

  • $C_{float}$ = float solids concentration (%)
  • $\eta$ = capture efficiency (0.95-0.98)
  • $Q_{float}$ = float withdrawal rate (m³/d)

Polymer Dose ​

$$P_{dose} = k_{poly} \times Q \times TSS$$

Where:

  • $k_{poly}$ = specific polymer demand (kg/kg DS), typically 0.002-0.006
  • Typical: 2-6 kg polymer per tonne dry solids

Design Parameters ​

Input Parameters ​

ParameterSymbolUnitRangeDefaultDescription
Feed concentration$TSS$mg/L3,000-15,0008,000WAS solids concentration
SVI-mL/g100-300150Sludge volume index
Target float DS$C_f$%3-64.5Desired thickened concentration
Operating pressure$P$bar(g)4-65Saturation pressure
Air-to-solids ratioA/Skg/kg0.01-0.050.03Design A/S ratio
Polymer dose$k_{poly}$kg/tDS2-84Specific polymer demand
Surface loading rateSLRm/h5-128Hydraulic loading
Recycle ratio$R$%30-10060Percentage of feed flow

Output Parameters ​

ParameterUnitDescription
Required aream²DAF tank surface area
Tank dimensionsmLength × width × depth
Recycle flowm³/hPressurized recycle rate
Float productionm³/dThickened sludge (float) volume
Subnatant flowm³/dClarified liquid return
Solids capture%Percentage to float
Polymer consumptionkg/dDaily polymer usage
Air compressor dutykWCompressor power requirement

Configuration Guide ​

Step-by-Step Setup ​

  1. Characterize Feed Sludge

    • Measure SVI (critical for DAF)
    • Determine solids concentration
    • Identify sludge type (WAS, MBR, industrial)
    • Run jar test with polymer to estimate dose
  2. Select Operating Pressure

    • Standard: 5 bar gauge (6 bar absolute)
    • Higher pressure (6 bar): Smaller bubble size, better for tough sludge
    • Lower pressure (4 bar): Energy saving, adequate for easy-to-float sludge
  3. Determine Air-to-Solids Ratio

    • Extended aeration WAS (SVI 150-200): 0.03-0.04
    • Standard WAS (SVI 100-150): 0.02-0.03
    • Primary + WAS: 0.01-0.02
  4. Calculate DAF Area

    Method 1: Surface Loading Rate

    For Q = 500 m³/d = 20.8 m³/h
    Use SLR = 8 m/h
    A = Q/SLR = 20.8/8 = 2.6 m²
    Use 3m × 2m = 6 m² (conservative for peaking)

    Method 2: Solids Loading

    Solids load = 500 × 8 kg/m³ = 4,000 kg/d
    SLR_solids = 100 kg/m²·d
    A = 4,000/100 = 40 m²

    Typically method 1 controls for DAF.

  5. Calculate Recycle Rate

    For A/S = 0.03, P = 6 bar abs, f = 0.7, Ss = 8 kg/m³
    Air supplied per m³ recycle:
    Ca = 1.3 × 19 × (0.7×6 - 1) = 77.9 mg/L = 0.078 kg/m³
    
    Air required: 0.03 kg/kg × 8 kg/m³ = 0.24 kg/m³ feed
    Recycle ratio: 0.24/0.078 = 3.1 m³ recycle / m³ feed
    
    This is too high! Adjust:
    - Increase pressure to 6 bar → Ca = 91 mg/L → R = 2.6 → Still high
    - Reduce A/S to 0.02 → R = 1.7 → More reasonable
    - Or use higher recycle pressure (7 bar)
    
    Practical: Use R = 0.6 (60% recycle) with A/S = 0.025
    QR = 500 × 0.6 = 300 m³/d = 12.5 m³/h
  6. Size Polymer System

    • Polymer type: Cationic, high molecular weight (8-12M Da)
    • Dose: 4 kg/tonne DS
    • For 4,000 kg DS/d: 16 kg/d polymer (active)
    • Makeup system: 0.2-0.5% solution
    • Aging: 30-60 minutes
  7. Design Float Removal

    • Beach scraper or flight scraper
    • Scraper speed: 1-3 m/min
    • Float depth: 100-300mm before removal
    • Continuous or intermittent removal

Typical Design Values ​

Sludge TypeSVIFeed DSA/SPolymerFloat DSSLRCapture
Extended aer. WAS180-2500.6-1.0%0.03-0.045-8 kg/t4-5%6-10 m/h95-98%
Standard WAS100-1500.8-1.5%0.02-0.033-5 kg/t4.5-5.5%8-12 m/h96-99%
MBR sludge120-1801.0-1.5%0.025-0.0354-6 kg/t4-5%7-11 m/h95-98%
Primary + WAS80-1201.5-2.5%0.015-0.0252-4 kg/t5-6%9-13 m/h97-99%

Performance Criteria ​

Achievable Float Concentrations ​

Feed SludgeSVI (mL/g)Feed DS (%)Float DS (%)Volume Reduction (%)
Extended aer. WAS200-2500.6-0.84.0-4.583-87%
Extended aer. WAS150-2000.8-1.04.5-5.080-85%
Standard WAS100-1501.0-1.55.0-5.575-82%
MBR sludge120-1801.0-1.54.5-5.075-82%
Primary + WAS80-1202.0-2.55.5-6.565-75%

Solids Capture ​

  • Typical: 95-98%
  • With optimized polymer: 97-99%
  • Poor performance: <90% (indicates issues)

Subnatant Quality ​

  • TSS: 20-100 mg/L (excellent, suitable for direct return)
  • Lower than gravity thickener overflow
  • Biological sludge: 30-50 mg/L typical
  • Primary + biological: 50-100 mg/L

Troubleshooting ​

IssueCauseSolution
Low float concentrationExcessive float withdrawalReduce float removal rate
Insufficient polymerIncrease dose, check polymer quality
Low A/S ratioIncrease recycle flow or pressure
Poor polymer mixingCheck static mixer, increase contact time
High subnatant TSSPolymer underdoseIncrease polymer dose
Hydraulic overloadReduce feed rate, add capacity
Poor air distributionCheck saturator, nozzle cleanliness
Polymer overdose (deflocculation)Reduce dose, check mixing intensity
FoamingExcessive airReduce recycle or pressure
Surfactants in feedDefoamer spray, reduce air
Poor float removalIncrease scraper speed/frequency
Low air dissolutionSaturator issuesCheck saturation pressure, clean nozzles
Compressor underperformanceVerify compressor output, check for leaks
Temperature too highCool recycle, check heat exchangers
Brown/black subnatantSludge age too high (septicity)Reduce SRT in aeration, increase withdrawal
Poor float removal (re-sinking)Increase scraper frequency
Scraper jammingFloat too thickIncrease withdrawal rate
Rag/debris accumulationScreen feed, manual cleaning
Variable performanceFeed flow variationFlow equalization, automate polymer dosing
Polymer qualityCheck polymer batch, aging time

Operation & Maintenance ​

Daily Checks ​

  • Visual inspection of float formation
  • Monitor subnatant clarity
  • Verify recycle pressure (5-6 bar)
  • Check polymer dosing pump operation
  • Observe scraper movement
  • Review float withdrawal rate

Weekly Maintenance ​

  • Clean saturator nozzles
  • Check air compressor operation
  • Verify polymer makeup concentration
  • Inspect float beach/collection
  • Review polymer consumption vs. solids
  • Calibrate online instruments (pressure, flow)

Monthly Tasks ​

  • Drain and clean DAF tank
  • Inspect scraper mechanism
  • Check saturator internals
  • Calibrate polymer pump
  • Measure float and subnatant TSS (lab)
  • Review energy consumption (compressor)

Annual Tasks ​

  • Overhaul air compressor
  • Replace saturator nozzles
  • Full scraper and drive inspection
  • Clean/replace polymer static mixer
  • Pressure vessel inspection (saturator)
  • Review performance vs. design

Advanced Features ​

Auto-Polymer Dosing ​

Streaming current detector (SCD):

  • Measures zeta potential in real-time
  • Targets optimal polymer dose (neutral charge)
  • Can reduce polymer consumption by 10-30%

White Water Recycle ​

Using clarified subnatant as pressurized recycle:

  • Saves clean water
  • Improves consistency
  • Possible if subnatant TSS <50 mg/L

Variable Pressure Control ​

Adjust pressure based on feed characteristics:

  • High SVI: Increase to 6 bar for smaller bubbles
  • Low SVI: Reduce to 4 bar for energy saving

Coagulant Addition ​

Adding ferric or alum (0.5-2 kg/tonne DS):

  • Improves capture for difficult sludge
  • Reduces polymer consumption
  • Increases inorganic content of float

Energy Considerations ​

Power Consumption ​

Air compressor: $$P_{comp} = \frac{Q_R \times \Delta P}{\eta_{comp}}$$

Where:

  • $P_{comp}$ = compressor power (kW)
  • $Q_R$ = recycle flow (m³/h)
  • $\Delta P$ = pressure increase (bar)
  • $\eta_{comp}$ = compressor efficiency (0.6-0.7)

Typical:

  • 0.5-1.5 kWh/m³ feed treated
  • For 500 m³/d: 10-30 kW average

Cost Comparison (Operating) ​

DAF vs. Gravity Thickening:

ItemGravity ThickenerDAF Thickener
Power1-2 kW (pickets)10-30 kW (compressor)
PolymerNone£50-150/d (for 4,000 kg DS/d)
O&M laborLowModerate
Footprint250 m²6-20 m²
Capital cost£200k£500k-1M

When DAF makes sense:

  • High-SVI sludge (gravity fails)
  • Limited footprint
  • Excellent subnatant quality required
  • Willingness to pay for polymer/energy

Worked Example ​

Given ​

  • Extended aeration WAS: 400 m³/d @ 0.8% DS (8 kg/m³)
  • SVI: 200 mL/g
  • Target float: 4.5% DS
  • Operating pressure: 5 bar gauge (6 bar absolute)

Solution ​

Step 1: Select A/S ratio

High SVI → Use A/S = 0.03 kg air/kg solids

Step 2: Calculate recycle ratio

Sa = 19 mg/L, f = 0.7, P = 6 bar abs
Air dissolved per m³ recycle:
Ca = 1.3 × 19 × (0.7×6 - 1) = 77.9 mg/L = 0.078 kg/m³

Air needed: 0.03 kg/kg × 8 kg/m³ feed = 0.24 kg/m³ feed
Recycle ratio: R = 0.24/0.078 = 3.08

This is too high! Reduce A/S to 0.02:
Air needed: 0.02 × 8 = 0.16 kg/m³
R = 0.16/0.078 = 2.05 → Still high

Use higher pressure (7 bar abs):
Ca = 1.3 × 19 × (0.7×7 - 1) = 103 mg/L
R = 0.16/0.103 = 1.55

Or use R = 0.8 (80%) and accept A/S = 0.025

Use practical: R = 0.7 (70%), A/S = 0.027

QR = 400 × 0.7 = 280 m³/d = 11.7 m³/h

Step 3: Calculate DAF area

Use SLR = 8 m/h
Q_total = 400 + 280 = 680 m³/d = 28.3 m³/h (feed + recycle)
A = 28.3/8 = 3.5 m²

Use 4m × 2m = 8 m² (allows for peaking and redundancy)
Actual SLR = 28.3/8 = 3.5 m/h ✓ (conservative)

Step 4: Float production

Solids in: 400 × 8 = 3,200 kg/d
Capture: 96%
Solids to float: 3,200 × 0.96 = 3,072 kg/d
Float at 4.5% DS (45 kg/m³):
Q_float = 3,072/45 = 68 m³/d
Volume reduction: (400-68)/400 = 83%

Step 5: Polymer dose

Use 5 kg/tonne DS
Daily polymer: 3.2 × 5 = 16 kg/d
Annual polymer: 5.8 tonnes/year
Cost @ £2,000/tonne: £11,600/year

Step 6: Compressor sizing

QR = 280 m³/d = 11.7 m³/h
ΔP = 6 bar = 600 kPa
Power = (11.7 × 600)/(3600 × 0.65) = 3.0 kW
Use 5 kW motor (safety factor)
Energy: 3 kW × 24 h = 72 kWh/d

References ​

  1. WEF (2018). Design of Municipal Wastewater Treatment Plants, MOP 8, 6th Ed., Ch. 17.
  2. Metcalf & Eddy (2014). Wastewater Engineering, 5th Ed., pp. 1610-1625.
  3. Edzwald, J.K. (2010). Dissolved Air Flotation and Me. Water Research, 44(7), 2077-2106.
  4. Bratby, J. (2016). Coagulation and Flocculation in Water and Wastewater Treatment, 3rd Ed.
  5. Haarhoff, J. & Edzwald, J.K. (2004). "Dissolved Air Flotation Modeling." J. Water Supply Research & Technology - AQUA.
  6. CIWEM (2013). Sewage Sludge Treatment and Disposal, Manual of Practice.