Skip to content

Design Calculations Overview ​

Sizing and verification calculations for process units

Introduction ​

ErgoPlanner provides comprehensive design calculations based on industry standards and best practices. Use these tools to size equipment, verify capacity, and check design margins.

Calculation Categories ​

By Process ​

CategoryUnits Covered
PreliminaryScreens, grit chambers
PrimaryClarifiers, settlers
BiologicalReactors, biofilm systems
SecondaryFinal clarifiers, DAF
TertiaryFilters, UV, membranes
SludgeThickeners, digesters

By Method ​

MethodDescription
SizingDetermine equipment dimensions
VerificationCheck existing equipment capacity
OptimizationImprove performance parameters

Design Standards ​

UK Water Industry ​

ErgoPlanner incorporates UK water company design criteria:

ParameterTypical Criteria
Primary retention2-3 hours at DWF
Secondary SOR<1.0 m³/m²·h at 3DWF
Biofilter loading0.15-0.3 kg BOD/m³·d
Humus tank SOR1.2-2.0 m³/m²·h

International Standards ​

StandardCoverage
WEF MOP 8Clarifier design
Ten StatesUS design standards
ATV-DVWKGerman standards
ISOQuality systems

Detailed Guides ​

Primary Treatment ​

Biological Treatment ​

  • Biofilters - Trickling filter design
  • Activated sludge sizing
  • MBBR media calculations

Secondary Treatment ​

  • Humus Tanks - Post-biofilter settling
  • Secondary clarifier design
  • DAF sizing

Chemical Systems ​

Key Design Parameters ​

Hydraulic Parameters ​

ParameterSymbolUnit
Surface Overflow RateSORm³/m²·h
Hydraulic Loading RateHLRm³/m²·d
Hydraulic Retention TimeHRThours
Weir LoadingWLm³/m·h

Organic Parameters ​

ParameterSymbolUnit
Organic Loading RateOLRkg BOD/m³·d
Food/Mass RatioF/Mkg/kg·d
Sludge Loading RateSLRkg MLSS/m²·h
Solids Retention TimeSRTdays

Design Workflow ​

Sizing New Units ​

mermaid
graph TD
    A[Define Design Flow] --> B[Calculate Loads]
    B --> C[Select Unit Type]
    C --> D[Apply Design Criteria]
    D --> E[Size Equipment]
    E --> F[Verify Capacity]
    F --> G{Acceptable?}
    G -->|No| D
    G -->|Yes| H[Document Design]

Verification ​

  1. Input existing equipment data
  2. Define current/future loads
  3. Calculate utilization
  4. Identify bottlenecks
  5. Recommend upgrades

Where the calculation forms are ​

You do not need a simulation run to open a sizing form. The forms take an influent you enter and work it through in the browser, and the runs you save from them are kept against a project or a drawing — never against a simulation run.

There are two places to open them, and they are the same forms in both:

WhereHow to get there
Project detail pageOpen the project → Calculations tab → Process calculations
Simulation editorBottom data panel → Calculation tab → Process calculations

Pick a module from the Calculation module box — type to search it — and its form opens underneath. Ten modules are offered: flow and load, primary tanks, biofilters, humus tanks, chemical dosing, alkalinity balance, sludge production, ballasted precipitation (CoMag), the headroom report, and mass balance.

The project mount is the one to use for design work that has no model yet, and it shows the runs saved against that project. The editor mount is convenient while you are in a model, and lists every saved run for the module.

Whichever module you have open is written into the address bar, so the link in your browser is already a link to it:

/admin/projects/<project-id>?tab=calculations&calc=process&module=coMag

Send that and your colleague lands on the same module. Reloading the page keeps you there too.

The editor's other surface, Unit sizing, is the one that does need a run — it reads flows and loads off a converged model for whichever unit is selected on the canvas. If no model has been run it says so, and points you at the Process calculations tab.

Using ErgoPlanner ​

Design Mode ​

  1. Select unit type
  2. Click Design Wizard
  3. Enter design criteria
  4. Review calculated dimensions
  5. Accept or modify

Verification Mode ​

  1. Enter existing dimensions
  2. Specify loading conditions
  3. View capacity analysis
  4. Export design report

Example: Primary Clarifier ​

Design Inputs ​

ParameterValue
Design flow10,000 m³/d
Peak flow30,000 m³/d
Influent TSS250 mg/L
Target removal60%

Design Criteria ​

ParameterCriterion
HRT at DWF>2 hours
SOR at 3×DWF<1.5 m³/m²·h
Depth3.0-4.5 m
Weir loading<10 m³/m·h

Calculated Results ​

ParameterValue
Required area833 m²
Diameter33 m
Depth3.5 m
Volume2,917 m³
HRT at DWF7.0 h
SOR at 3×DWF1.5 m³/m²·h

Design Reports ​

ErgoPlanner generates comprehensive design reports:

  • Equipment schedule
  • Design calculations
  • Drawing references
  • Specification notes

Report Sections ​

  1. Design basis - Flows, loads, criteria
  2. Calculations - Step-by-step sizing
  3. Results - Final dimensions
  4. Verification - Capacity check
  5. Notes - Assumptions, references

Best Practices ​

  1. Apply safety factors - 1.2-1.5 for design
  2. Consider future loads - 20-year horizon
  3. Check all conditions - DWF, PWF, peak
  4. Document assumptions - For future reference
  5. Peer review - Independent check

References ​

  1. Metcalf & Eddy "Wastewater Engineering"
  2. WEF Manual of Practice No. 8
  3. UKWIR Design Guidelines
  4. Ten States Standards