Comminutor ​

In-line mechanical grinder that shreds solids into fine particles instead of removing them, reducing downstream clogging and pumping issues.

Overview ​

Comminutors are rotating cutting devices installed in the wastewater flow channel that macerate large solids into smaller pieces (typically <6-10mm). Unlike screens which remove solids for disposal, comminutors keep shredded material in the flow, making downstream pumping easier and reducing screenings handling requirements.

When to Use ​

  • Pumping stations (protect pumps from clogging)
  • Small treatment plants without screening facilities
  • Industrial sites with fibrous materials
  • Retrofit of plants with pump problems
  • Upstream of grinders or macerators
  • When screenings disposal is problematic

Key Characteristics ​

  • Reduces solid size without removal
  • Protects pumps from clogging/damage
  • No screenings to handle or dispose
  • Increases downstream solids load
  • Requires regular maintenance (blade wear)
  • Not suitable as sole pretreatment for modern plants

Operating Modes ​

Basic Mode ​

  • Fixed size reduction (particles to <10mm)
  • Simplified power calculation
  • Constant rotational speed

Advanced Mode ​

  • Particle size distribution modeling
  • Variable speed control
  • Power based on solids loading
  • Clog detection and reversal

Mathematical Model ​

Governing Equations ​

Size Reduction ​

$$d_{out} = d_{in} \times R_{reduction}$$

Where:

  • $d_{out}$ = output particle size (mm)
  • $d_{in}$ = input particle size (mm)
  • $R_{reduction}$ = reduction ratio (typically 0.1-0.2)

Typical performance: Reduces 90% of particles to <6-10mm

Power Requirement ​

$$P = P_0 + k \times Q \times SS$$

Where:

  • $P$ = power consumption (kW)
  • $P_0$ = no-load power (0.5-2 kW depending on size)
  • $k$ = specific energy (0.002-0.005 kWh/kg solids)
  • $Q$ = flow rate (m³/h)
  • $SS$ = suspended solids concentration (kg/m³)

Headloss ​

$$h_L = K \times \frac{v^2}{2g}$$

Where:

  • $h_L$ = headloss through unit (m)
  • $K$ = loss coefficient (1.5-3.0)
  • $v$ = approach velocity (m/s)
  • $g$ = 9.81 m/s²

Typical: 50-150mm headloss when clean

Torque Requirement ​

$$T = F \times r$$

Where:

  • $T$ = torque (N·m)
  • $F$ = cutting force (N, depends on material)
  • $r$ = cutter radius (m)

Design Parameters ​

Input Parameters ​

ParameterSymbolUnitRangeDefaultDescription
Flow rateQm³/h10-5000500Design flow
Channel widthWm0.3-2.00.8Channel width
Rotor diameterDm0.2-0.90.5Cutter diameter
Rotational speedNrpm30-15060Cutter rotation
Bar spacingsmm6-2510Clearance opening
Number of cuttersn-2-84Cutting edges

Output Parameters ​

ParameterUnitDescription
Particle size (max)mm90th percentile output size
Size reduction%Fraction of large particles reduced
Power consumptionkWElectrical demand
HeadlossmPressure drop
Maintenance intervalhoursOperating hours between service

Configuration Guide ​

Step-by-Step Setup ​

  1. Select Unit Size

    • Based on peak flow capacity
    • Channel width compatibility
    • Solids loading estimate
  2. Choose Comminutor Type

    • Vertical screen: Rotating cutter against fixed bars
    • Drum: Rotating perforated drum with internal cutter
    • In-line grinder: Dual-shaft cutting mechanism
  3. Determine Installation Location

    • Before pumps: Protect pumps (most common)
    • After screens: Reduce screenings, supplement screening
    • Before primary treatment: Reduce grit/fiber issues
  4. Configure Drive System

    • Motor size from flow and solids load
    • VFD for variable speed (optional)
    • Torque limiter to prevent damage
    • Reverse capability for clearing jams
  5. Design Channel Approach

    • Smooth transitions to unit
    • Velocity 0.6-1.2 m/s
    • Bypass channel with gate (for maintenance)
  6. Plan Maintenance Access

    • Lifting equipment (unit is heavy)
    • Space for cutter removal
    • Parts storage

Typical Design Values ​

ApplicationFlow (m³/h)Rotor DiameterPowerOutput Size
Small pump station50-2000.3-0.4m1-3 kW<10mm
Medium pump station200-8000.5-0.6m3-7 kW<8mm
Large municipal800-30000.7-0.9m7-15 kW<6mm
Industrial (fibers)100-5000.4-0.6m5-10 kW<10mm

Cutter Design ​

Types of Cutters:

  1. Shear bars: Fixed bars with rotating cutter passing through
  2. Slotted plate: Rotating cutter pushes through perforations
  3. Scissor action: Counter-rotating cutters

Clearance:

  • Determines maximum particle size
  • Tighter (6-10mm): Better size reduction, more power, faster wear
  • Wider (15-25mm): Less power, longer life, larger output particles

Performance Criteria ​

Size Reduction Effectiveness ​

Input SizeOutput Size (90th %ile)Application
>100mm (rags, debris)<10mmStandard municipal
50-100mm<6mmHigh-performance unit
Fibrous materials<15mmMay string, less effective

UK Design Standards ​

ParameterValueStandard
Approach velocity0.6-1.2 m/sMWH
Maximum headloss150-250mmTypical
Redundancy100% standby recommendedSewers for Adoption
SafetyLockout/tagout requiredHSE

Types of Comminutors ​

Vertical Bar Screen Type (Most Common) ​

Design:

  • Stationary vertical bars (screen)
  • Rotating cutter drum or shaft
  • Solids shredded against bars

Advantages:

  • Simple, proven design
  • Effective on most materials
  • Easy blade replacement

Disadvantages:

  • Can clog with rags, plastics
  • Regular blade sharpening needed

Examples: Muffin Monster, Wemco, Franklin Miller

In-Channel Grinder ​

Design:

  • Low-profile unit sits in channel floor
  • Dual counter-rotating cutters
  • Solids pulled down and shredded

Advantages:

  • Minimal headloss
  • Compact installation
  • Good for retrofits

Disadvantages:

  • More complex mechanics
  • Difficult to access for maintenance

Drum/Perforated Screen Type ​

Design:

  • Rotating perforated drum
  • Internal cutter bar(s)
  • Solids forced through perforations

Advantages:

  • Good screening + size reduction
  • Handles high flows

Disadvantages:

  • Larger, more expensive
  • Can blind with fats/fibers

Troubleshooting ​

IssueCauseSolution
Frequent jammingRags, plastics wrappingInstall upstream coarse screen
Dull cuttersSharpen or replace cutting edges
Foreign objects (metal, rocks)Remove, check for damage
Motor undersizedVerify torque, upgrade if needed
High power consumptionBlunt cuttersReplace/sharpen cutters
High solids loadNormal, may need larger unit
Binding/rubbingCheck alignment, clearances
Excessive vibrationCutter imbalanceBalance rotor, check for damage
Bearing wearReplace bearings
Loose mountingTighten bolts, check foundation
Poor size reductionWide clearanceAdjust clearance, replace worn parts
High flow velocityReduce flow or increase unit size
Cutter orientation wrongCheck installation, manufacturer specs
Odor/septicity downstreamIncreased retention timeExpected (more surface area)
Organic matter shreddingNormal, not removable
Motor trips/overloadJam conditionClear obstruction, check thermal overload
Torque spikeVerify torque limiter setting

Operation & Maintenance ​

Daily Checks ​

  • Visual inspection of operation
  • Listen for unusual noise
  • Check for visible leaks
  • Monitor power consumption (if instrumented)
  • Verify no jamming/stalling

Weekly Maintenance ​

  • Check cutter clearance (wear)
  • Inspect for wrapped materials
  • Lubricate bearings (per manufacturer)
  • Clean any debris from guards/housing

Monthly Tasks ​

  • Detailed inspection (shut down, lockout)
  • Measure cutter-to-bar clearance
  • Check drive belt/chain condition (if applicable)
  • Inspect motor and gearbox
  • Verify torque limiter setting

Quarterly Tasks ​

  • Replace or sharpen cutting edges
  • Inspect bars/screens for wear
  • Check bearing condition
  • Verify alignment
  • Test emergency stop

Annual Tasks ​

  • Major overhaul (bearings, seals, cutters)
  • Structural inspection
  • Drive system service
  • Performance evaluation (particle sizing)
  • Update spare parts inventory

Advantages & Disadvantages ​

Advantages ​

  • No screenings to handle or dispose
  • Protects downstream pumps
  • Reduces clogging in pipes and tanks
  • Relatively low capital cost
  • Small footprint

Disadvantages ​

  • Does NOT remove solids (increases downstream load)
  • Increases BOD/COD in wastewater (releases organics)
  • Not suitable for MBR or membrane systems (damages membranes)
  • Regular blade replacement required
  • Can increase grit abrasion
  • May cause septicity (more surface area for bacteria)

Modern Practice ​

Comminutors in Contemporary Design ​

Historical:

  • Common in 1960s-1980s
  • Used as alternative to screening
  • Pumping stations often used comminutors alone

Current Trend:

  • Declining use in municipal treatment plants
  • Screening preferred (removes material, better for biological treatment)
  • Still used in pumping stations for pump protection
  • Not acceptable as sole pretreatment for:
    • MBR systems
    • Advanced nutrient removal
    • Stringent effluent standards

Good Applications:

  • Lift/pump stations (supplemental to screening)
  • Industrial sites with specific shredding needs
  • Small package plants (limited space)

Poor Applications:

  • Primary treatment replacement (use screens instead)
  • Upstream of membranes (particles damage membranes)
  • High-performance biological systems (prefer solids removal)

Comparison with Screening ​

FeatureComminutorScreening
Solids removal0% (shreds only)30-80% (removes)
Downstream loadIncreasesDecreases
Screenings handlingNoneRequired (disposal)
Pump protectionGoodExcellent (removes)
MBR/membrane suitabilityPoorExcellent
Biological treatmentIncreases loadReduces load
Capital costLow-mediumMedium-high
Operating costMedium (blades)Low-medium (disposal)

Current Best Practice:

  • Primary: Use screening (coarse + fine)
  • Supplemental: Add comminutor at pump stations if needed
  • Not: Comminutor as sole pretreatment

Worked Example ​

Given ​

  • Pumping station: 300 m³/h peak flow
  • Channel width: 0.8m
  • Influent TSS: 400 mg/L
  • Solids with rags, paper, organics
  • Goal: Protect downstream pumps

Design ​

Step 1: Select Comminutor Size

From manufacturer data, choose unit rated for 400 m³/h

Step 2: Verify Channel Velocity

Assume depth at peak flow: d = 0.6m

$$v = \frac{Q}{W \times d \times 3600} = \frac{300}{0.8 \times 0.6 \times 3600} = 0.17 \text{ m/s}$$

Too low! Channel should be narrower or unit should be installed in a contraction.

Revise: Install with contraction to 0.5m width: $$v = \frac{300}{0.5 \times 0.6 \times 3600} = 0.28 \text{ m/s}$$ ✓ (acceptable)

Step 3: Estimate Power

No-load power: P₀ = 2 kW (typical for this size)

Specific energy: k = 0.003 kWh/kg

Solids loading: 300 m³/h × 0.4 kg/m³ = 120 kg/h

$$P = 2 + 0.003 \times 120 = 2.36 \text{ kW}$$

Select 5 kW motor (safety factor ~2)

Step 4: Estimate Headloss

K = 2.0 (typical)

$$h_L = 2.0 \times \frac{0.28^2}{2 \times 9.81} = 0.008 \text{ m} = 8 \text{ mm}$$

Very low (acceptable)

Step 5: Configuration

  • Install upstream of pumps
  • Provide bypass channel with gate
  • VFD for variable speed (optional, for energy savings)
  • Torque limiter: Set to 150% of normal operating torque
  • Reverse function for jam clearing

Step 6: Maintenance Planning

  • Inspect cutters monthly
  • Replace/sharpen cutters every 3-6 months (depends on wear)
  • Keep spare cutter set on hand
  • Budget ~£500-1000/year for consumables

References ​

  1. WEF (2018). Design of Municipal Wastewater Treatment Plants, MOP 8.
  2. Metcalf & Eddy (2014). Wastewater Engineering, 5th Ed.
  3. Franklin Miller Inc. Comminutor Design and Application Guide.
  4. JWC Environmental. Muffin Monster Technical Manual.
  5. Water UK (2017). Sewers for Adoption, 8th Ed.
  6. Tchobanoglous, G. et al. (2003). Wastewater Engineering: Treatment and Reuse, 4th Ed.