Industry standards and design criteria reference
Overview
ErgoPlanner incorporates design criteria from major international standards. This reference summarizes key design parameters.
UK Water Industry Standards
Sewers for Adoption (8th Edition)
| Parameter | Requirement |
|---|---|
| Minimum gradient (100mm) | 1:80 |
| Minimum gradient (150mm) | 1:150 |
| Minimum velocity | 0.75 m/s at 1/3 full |
| Maximum velocity | 3.0 m/s |
Design Flow Multiples
| Element | DWF Multiple |
|---|---|
| Primary settlement | 3 × DWF |
| Biological treatment | 3 × DWF |
| Final settlement | 3 × DWF |
| Storm tanks | 6 × DWF |
Preliminary Treatment
| Parameter | Criterion |
|---|---|
| Coarse screen spacing | 50-150 mm |
| Fine screen spacing | 3-6 mm |
| Grit channel velocity | 0.3 m/s |
| Grit chamber detention | 60 seconds |
Primary Settlement
| Parameter | Value |
|---|---|
| Retention at DWF | 2-3 hours |
| Retention at 3×DWF | 0.67-1.0 hour |
| Surface loading at 3×DWF | <1.5 m³/m²·h |
| Weir loading | <10 m³/m·h |
| Tank depth | 3.0-4.5 m |
Biological Filters
| Parameter | Low Rate | High Rate |
|---|---|---|
| Hydraulic loading | 0.1-0.4 m³/m²·h | 0.5-3.0 m³/m²·h |
| Organic loading | 0.08-0.15 kg/m³·d | 0.3-1.2 kg/m³·d |
| Media depth | 1.8-2.5 m | 1.2-2.0 m |
| Recirculation | Optional | 0.5-4.0:1 |
Humus Tanks
| Parameter | Criterion |
|---|---|
| Surface loading | 1.2-2.0 m³/m²·h |
| Retention time | >1.5 hours |
| Depth | 2.5-3.5 m |
Activated Sludge
| Parameter | Extended | Conventional |
|---|---|---|
| F/M ratio | 0.05-0.15 | 0.2-0.6 |
| MLSS | 3,000-6,000 | 1,500-3,000 |
| HRT | 18-36 h | 4-8 h |
| SRT | 20-40 d | 5-15 d |
Final Settlement
| Parameter | Criterion |
|---|---|
| Surface loading at DWF | <0.6 m³/m²·h |
| Surface loading at 3×DWF | <1.0 m³/m²·h |
| Solids loading | <5 kg/m²·h |
| Weir loading | <12 m³/m·h |
US Standards
Ten States Standards
| Unit | Key Criteria |
|---|---|
| Primary clarifiers | SOR ≤ 800 gpd/ft² at design |
| Aeration basins | Min 6h HRT at design |
| Secondary clarifiers | SOR ≤ 600 gpd/ft² at design |
| Digesters | Min 15 days HRT |
WEF/ASCE Guidelines
Refer to:
- WEF MOP 8: Clarifier Design
- WEF MOP 30: Nitrogen Removal
- WEF MOP 34: Nutrient Removal
European Standards
ATV-DVWK (German)
| Parameter | Criterion |
|---|---|
| Specific volume (ASP) | 1.5-2.0 L/PE |
| SVI design | <150 mL/g |
| Peak factor (small) | 2.5-3.0 |
| Peak factor (large) | 1.8-2.2 |
DIN Standards
| Standard | Coverage |
|---|---|
| DIN 4261 | Small treatment plants |
| DIN 4262 | Sewer construction |
| DIN EN 12255 | WWT plant standards |
Discharge Standards
UK Urban Waste Water Directive
| Parameter | Population | Limit |
|---|---|---|
| BOD₅ | >2,000 PE | 25 mg/L |
| COD | >2,000 PE | 125 mg/L |
| TSS | >2,000 PE | 35 mg/L |
| TN | >10,000 PE | 15 mg/L |
| TP | >10,000 PE | 2 mg/L |
Sensitive Area Limits
| Parameter | 10,000-100,000 PE | >100,000 PE |
|---|---|---|
| TN | 15 mg/L | 10 mg/L |
| TP | 2 mg/L | 1 mg/L |
Safety Factors
General Design
| Application | Safety Factor |
|---|---|
| Preliminary sizing | 1.2-1.5 |
| Detailed design | 1.1-1.25 |
| Nitrification capacity | 1.5-2.0 |
| Peak hydraulic | 3.0 × DWF |
Equipment Selection
| Equipment | Factor |
|---|---|
| Pumps | 1.1-1.2 |
| Blowers | 1.1-1.15 |
| Mixers | 1.15-1.25 |
| Standby units | N+1 minimum |
Process-Specific Criteria
Nitrification
| Parameter | Requirement |
|---|---|
| DO | >2.0 mg/L |
| Alkalinity | >50 mg/L as CaCO₃ |
| Temperature | >10°C |
| pH | 7.0-8.5 |
| SRT @ 10°C | >12 days |
Denitrification
| Parameter | Requirement |
|---|---|
| DO | <0.5 mg/L |
| C:N ratio | >4:1 (bsCOD:NO₃-N) |
| Temperature | >5°C |
| Anoxic fraction | 20-40% |
EBPR
| Parameter | Requirement |
|---|---|
| VFA:P ratio | >20:1 |
| Anaerobic HRT | 0.5-2.0 h |
| Anaerobic DO | 0 mg/L |
| Anaerobic NO₃ | <1 mg/L |
ErgoPlanner Integration
Automatic Checks
ErgoPlanner validates designs against:
- Selected standard (UK, US, EU)
- Design criteria databases
- Best practice guidelines
Warnings
Design warnings triggered when:
- Loading exceeds criteria
- Safety factors insufficient
- Parameters outside range
Reports
Generate compliance reports showing:
- Design vs criteria comparison
- Margin calculations
- Recommendations
Related Topics
References
- Sewers for Adoption 8th Edition
- Ten States Standards
- WEF Manual of Practice Series
- ATV-DVWK Guidelines
- Metcalf & Eddy "Wastewater Engineering"