Coarse Screen ​

Mechanical bar screen with 25-75mm spacing for removal of large solids, rags, and debris from raw wastewater.

Overview ​

Coarse screens are the first line of defense in wastewater treatment, protecting downstream equipment from large objects that could cause blockages, damage pumps, or interfere with treatment processes. They consist of parallel bars or rods arranged to intercept floating and suspended materials.

When to Use ​

  • Headworks of all municipal WWTPs
  • Pumping stations (before pumps)
  • Combined sewer overflows (CSO)
  • Industrial wastewater with debris
  • Upstream of fine screens

Key Characteristics ​

  • Robust construction for heavy debris
  • Self-cleaning or manually raked
  • Low headloss when clean
  • Protects downstream equipment
  • Screenings disposal requirement

Operating Modes ​

Basic Mode ​

  • Fixed removal efficiency (default 95% of >25mm particles)
  • Simplified headloss calculation
  • Constant bar spacing

Advanced Mode ​

  • Kirschmer equation for headloss
  • Particle size distribution tracking
  • Clogging effects
  • Cleaning cycle optimization

Mathematical Model ​

Governing Equation - Kirschmer Headloss ​

$$h_L = \beta \times \left(\frac{w}{b}\right)^{4/3} \times \frac{v^2}{2g} \times \sin\theta$$

Where:

  • $h_L$ = headloss through clean screen (m)
  • $\beta$ = bar shape factor (dimensionless)
  • $w$ = bar width facing flow (m)
  • $b$ = clear spacing between bars (m)
  • $v$ = approach velocity (m/s)
  • $g$ = gravitational acceleration (9.81 m/s²)
  • $\theta$ = screen angle from horizontal (degrees)

Bar Shape Factor (β) ​

Bar Shapeβ Value
Sharp-edged rectangular2.42
Rectangular with semicircular upstream1.83
Rectangular with semicircular both sides1.67
Circular bars1.79
Tear-drop optimized0.76

Capture Efficiency ​

$$\eta = 1 - \exp\left(-\frac{d_p}{b}\right)$$

Where:

  • $\eta$ = capture efficiency (fraction)
  • $d_p$ = particle diameter (m)
  • $b$ = bar spacing (m)

Screenings Volume ​

$$V_s = Q \times C_s \times \eta \times \rho_s$$

Where:

  • $V_s$ = screenings volume (m³/d)
  • $Q$ = flow rate (m³/d)
  • $C_s$ = suspended solids concentration (kg/m³)
  • $\rho_s$ = screenings bulk density (kg/m³, typically 800-1000)

Design Parameters ​

Input Parameters ​

ParameterSymbolUnitRangeDefaultDescription
Clear spacingbmm25-7550Distance between bars
Bar widthwmm10-3012Thickness of bars
Screen angleθdegrees45-9075Angle from horizontal
Channel widthWm0.5-3.01.2Width of screen channel
Approach velocityvm/s0.6-1.00.8Velocity upstream
Bar shape--See tableRectangularCross-section type

Output Parameters ​

ParameterUnitDescription
Headloss (clean)mPressure drop through clean screen
Headloss (clogged)mMaximum headloss before cleaning
Screenings removedkg/dMass of captured material
Screenings volumem³/dVolume for disposal
Capture efficiency%Fraction of particles >spacing removed
Channel velocitym/sVelocity through openings

Configuration Guide ​

Step-by-Step Setup ​

  1. Determine Bar Spacing

    • Municipal: 50mm typical
    • Heavy debris: 75mm
    • Pre-fine screen: 25-40mm
  2. Calculate Channel Dimensions

    • Width from peak flow and velocity limits
    • Depth to maintain submergence
    • Allow for headloss buildup
  3. Select Bar Configuration

    • Bar shape (rectangular most common)
    • Bar width 10-12mm
    • Angle 60-80° for self-cleaning
  4. Configure Cleaning System

    • Mechanical rake (automatic)
    • Cleaning frequency from headloss sensor
    • Manual backup capability
  5. Plan Screenings Handling

    • Conveyor/compactor
    • Washing unit
    • Container/skip storage

Typical Design Values ​

ApplicationSpacingApproach VelocityMax HeadlossNotes
Municipal headworks50mm0.8 m/s0.5mMost common
Combined sewer75mm0.6 m/s0.3mHigh debris
Pre-fine screen25-40mm0.7 m/s0.4mTwo-stage system
Pumping station50mm0.9 m/s0.6mPump protection

Channel Velocity Limits ​

$$v_{channel} = v \times \frac{W}{W - n \times w}$$

Where:

  • $v_{channel}$ = velocity through bars (m/s)
  • $n$ = number of bars
  • Limit: $v_{channel}$ < 0.9 m/s (prevents forcing debris through)

Cleaning Frequency ​

$$t_{clean} = \frac{h_{max}}{K \times Q \times SS}$$

Typical K = 0.001-0.005 depending on wastewater characteristics

Performance Criteria ​

UK Design Standards ​

ParameterValueStandard
Peak flow approach velocity0.6-1.0 m/sMWH
DWF approach velocity0.4-0.7 m/sUK industry practice
Max headloss (clean)150mmUK industry practice
Max headloss (before clean)600mmUK operator
Channel through-bar velocity<0.9 m/sAll

Screenings Production ​

SourceScreenings Yield
Municipal (50mm)5-20 L/1000m³
Combined sewer20-60 L/1000m³
Industrial10-100 L/1000m³

Installation ​

Upstream Requirements ​

  • Approach channel length: >6× channel width
  • Benching to concentrate flow
  • Handrailing and access platform

Downstream Requirements ​

  • Recovery channel to restore velocity
  • Scour protection below screen
  • Bypass channel with penstock gate

Troubleshooting ​

IssueCauseSolution
Excessive headlossRake malfunctionInspect/repair rake mechanism
High debris loadIncrease cleaning frequency
Blinding (fats/fibers)Add screen washing
Debris pass-throughBent/broken barsReplace damaged bars
Excessive velocityReduce flow or widen channel
Odor problemsScreenings accumulationMore frequent removal
Poor washingInstall/improve washing system
Mechanical failureOverloadCheck for obstructions
Worn componentsScheduled maintenance

Operation & Maintenance ​

Daily Checks ​

  • Visual inspection for debris buildup
  • Check rake operation
  • Monitor headloss differential
  • Inspect screenings removal

Weekly Maintenance ​

  • Lubricate rake mechanism
  • Check drive chains/belts
  • Clean spray wash nozzles
  • Inspect screenings conveyor

Monthly Tasks ​

  • Measure actual headloss vs. calculated
  • Verify cleaning cycle timing
  • Check structural condition
  • Review screenings disposal records

Advanced Features ​

Headloss Monitoring ​

  • Differential pressure sensors
  • Automatic cleaning trigger
  • Alarm on excessive buildup

Optimized Cleaning ​

  • Variable rake speed
  • Flow-proportional cleaning
  • Energy optimization

Screenings Treatment ​

  • Compaction (reduce volume 3:1)
  • Washing (reduce organics 30-50%)
  • Dewatering to >30% dry solids

References ​

  1. WRc (1998). Sewage Treatment in Hot Climates. John Wiley & Sons.
  2. Metcalf & Eddy (2014). Wastewater Engineering, 5th Ed. McGraw-Hill.
  3. MWH (2005). Water Treatment Principles and Design, 2nd Ed.
  4. Tchobanoglous, G. et al. (2003). Wastewater Engineering: Treatment and Reuse, 4th Ed.
  5. Kirschmer, O. (1926). Untersuchungen über den Gefällsverlust an Rechen. Hydraulisches Institut der TH München.