Primary Tanks - PS208 Design Standards
Primary sedimentation tanks (PSTs) are the first stage of treatment following preliminary screening. They remove settleable solids and floating material through gravity settling, typically achieving 30-60% SS removal and 30-40% BOD removal.
UK PS208 Standards
Design Criteria
| Parameter | PS208 Limit | Units | Notes |
|---|---|---|---|
| Upflow velocity (DWF) | ≤ 1.2 | m/h | All tanks in service |
| Upflow velocity (FFT) | ≤ 2.0 | m/h | All tanks in service |
| Hydraulic retention time | ≥ 2.0 | hours | At DWF minimum |
| Sidewater depth (SWD) | ≥ 2.5 | m | Minimum operating depth |
| Weir loading (DWF) | ≤ 150 | m³/m/d | Effluent weir overflow rate |
| Minimum tanks | 2 | - | For N-1 compliance |
N-1 Compliance
With one tank out of service for maintenance:
- Upflow velocity at DWF ≤ 1.2 m/h
- Upflow velocity at FFT ≤ 2.0 m/h
- HRT at FFT ≥ 2 hours
Design Equations
Geometry Calculations
Radial (Circular) Tanks
Surface area:
A = π × (D/2)² = π × r²Where:
A= surface area (m²)D= diameter (m)r= radius (m)
Volume:
V_cylindrical = A × SWD
V_conical = (1/3) × π × r² × h_cone
V_total = V_cylindrical + V_conical
where: h_cone = r × tan(θ)Where:
SWD= sidewater depth (m)θ= floor slope angle (degrees)h_cone= height of conical section (m)
Typical dimensions:
- Diameter: 15-40 m
- SWD: 2.5-4.0 m
- Floor slope: 8-12° (typical 10°)
Rectangular Tanks
Surface area:
A = L × WVolume:
V = L × W × SWDWhere:
L= length (m)W= width (m)
Typical dimensions:
- Length: 20-60 m
- Width: 5-15 m
- Length:width ratio: 3:1 to 6:1
Hydraulic Calculations
Upflow Velocity (Surface Overflow Rate)
Formula:
V_up = Q / A / 24Where:
V_up= upflow velocity (m/h)Q= flow rate (m³/d)A= total surface area (m²)24= hours per day conversion
PS208 limits:
- At DWF: ≤ 1.2 m/h
- At FFT: ≤ 2.0 m/h
Physical meaning: Upflow velocity must be less than particle settling velocity for effective removal. Typical settling velocities:
- Coarse solids: 3-5 m/h
- Fine solids: 0.5-1.5 m/h
- Design margin ensures capture of finer particles
Hydraulic Retention Time
Formula:
HRT = (V / Q) × 24Where:
HRT= hydraulic retention time (hours)V= tank volume (m³)Q= flow rate (m³/d)
PS208 minimum: 2 hours at DWF
Typical values:
- At DWF: 2-4 hours
- At FFT: 1-2 hours
Removal Efficiency
Without Chemical Dosing
| Parameter | Removal (%) | Influent → Effluent |
|---|---|---|
| BOD | 30 | 300 → 210 mg/L |
| SS | 50 | 350 → 175 mg/L |
| NH₄-N | 0 | 37.5 → 37.5 mg/L |
| TP | 15 | 12.5 → 10.6 mg/L |
With Chemical Dosing (Fe or Al)
| Parameter | Removal (%) | Influent → Effluent |
|---|---|---|
| BOD | 40 | 300 → 180 mg/L |
| SS | 60 | 350 → 140 mg/L |
| NH₄-N | 0 | 37.5 → 37.5 mg/L |
| TP | 70 | 12.5 → 3.75 mg/L |
Effluent concentration:
C_eff = C_inf × (1 - E/100)Where:
C_eff= effluent concentration (mg/L)C_inf= influent concentration (mg/L)E= removal efficiency (%)
Effluent load:
Load_eff = (C_eff × Q) / 1000Where:
Load_eff= effluent load (kg/d)Q= flow (m³/d)
Sludge Production
Primary Sludge Without Chemicals
Formula:
Sludge_dry = TSS_removed = TSS_inf × (E_SS / 100)
Sludge_flow = (Sludge_dry / 1000) / (DS% / 100)Where:
TSS_removed= solids removed (kg/d)TSS_inf= influent TSS load (kg/d)E_SS= SS removal efficiency (%)DS%= dry solids concentration (%, typical 3-5%)
Typical primary sludge characteristics:
- Dry solids: 3-5% DS
- Volatile solids: 65-75% of DS
- Specific gravity: 1.02-1.05
With Chemical Dosing
Chemical sludge production adds to primary sludge (see Chemical Dosing):
Total_sludge = Primary_sludge + Chemical_sludge
Chemical_sludge = Fe_dose × 2.3 (kgSS/d)Worked Example
Design Basis
- Population: 5,000 PE
- DWF: 600 m³/d
- FFT (Formula A): 1,800 m³/d
- Influent: BOD 300 mg/L, SS 350 mg/L
Step 1: Determine Number and Size of Tanks
Try 2 radial tanks, D = 25 m each:
Single tank area:
A = π × (25/2)² = π × 12.5² = 490.9 m²
Total area = 490.9 × 2 = 981.7 m²Step 2: Check Upflow Velocity
At DWF (all tanks):
V_up = 600 / 981.7 / 24 = 0.025 m/h ✓
(Well below 1.2 m/h limit)At FFT (all tanks):
V_up = 1800 / 981.7 / 24 = 0.076 m/h ✓
(Well below 2.0 m/h limit)N-1 check (one tank out, area = 490.9 m²):
At DWF: V_up = 600 / 490.9 / 24 = 0.051 m/h ✓
At FFT: V_up = 1800 / 490.9 / 24 = 0.153 m/h ✓Step 3: Determine Tank Depth
Choose SWD = 3.0 m, floor slope = 10°
Volume per tank:
V_cylindrical = 490.9 × 3.0 = 1,472.7 m³
h_cone = 12.5 × tan(10°) = 2.20 m
V_conical = (1/3) × π × 12.5² × 2.20 = 359.4 m³
V_total = 1,472.7 + 359.4 = 1,832.1 m³ per tankTotal volume = 1,832.1 × 2 = 3,664.2 m³
Step 4: Check HRT
At DWF:
HRT = (3664.2 / 600) × 24 = 146.6 hours ✓
(Well above 2 hour minimum)At FFT:
HRT = (3664.2 / 1800) × 24 = 48.9 hours ✓N-1 at FFT:
HRT = (1832.1 / 1800) × 24 = 24.4 hours ✓Step 5: Calculate Sludge Production
Influent loads:
SS_load = (350 mg/L × 600 m³/d) / 1000 = 210 kgSS/dPrimary sludge (50% SS removal, 3% DS):
SS_removed = 210 × 0.50 = 105 kgSS/d
Sludge_flow = (105 / 1000) / 0.03 = 3.5 m³/dDesign Summary
| Parameter | Value | Compliance |
|---|---|---|
| Configuration | 2 × radial tanks | ✓ N-1 capable |
| Diameter | 25 m each | |
| SWD | 3.0 m | ✓ > 2.5 m |
| Total area | 981.7 m² | |
| Total volume | 3,664 m³ | |
| Upflow (DWF) | 0.025 m/h | ✓ < 1.2 m/h |
| Upflow (FFT) | 0.076 m/h | ✓ < 2.0 m/h |
| HRT (DWF) | 146.6 hours | ✓ > 2 hours |
| Sludge production | 3.5 m³/d at 3% DS |
UK Water Company Variations
UK Industry Practice
- Upflow velocity: 1.0 m/h preferred (DWF)
- HRT: 3 hours minimum preferred
- Chemical dosing common for P removal
UK Industry Practice
- Upflow velocity: 1.0-1.2 m/h (DWF)
- Rectangular tanks preferred for large works
- Storm tanks integrated with primary treatment
UK Industry Practice
- SWD: 3.0 m typical minimum
- N-1 compliance strictly enforced
- Combined primary/storm tank arrangements
Design Considerations
Tank Configuration
Radial tanks advantages:
- Efficient use of space (circular footprint)
- Good for smaller-medium works (PE < 20,000)
- Simple sludge collection with rotating scraper
- Conical floor aids sludge thickening
Rectangular tanks advantages:
- Better for large works (PE > 20,000)
- Can accommodate multiple lanes
- Easier to construct in linear site layouts
- Simpler to cover for odor control
Inlet Arrangements
Radial tanks:
- Central feed well with energy dissipation
- Diameter = 15-20% of tank diameter
- Inlet velocity < 0.3 m/s
Rectangular tanks:
- End-feed with baffle wall
- Cross-flow velocity < 0.15 m/s
- Flow distribution across width
Outlet Arrangements
Weir loading:
W_load = Q / L_weirWhere:
W_load= weir loading (m³/m/d)L_weir= total weir length (m)- PS208 limit: ≤ 150 m³/m/d
Radial tanks:
- Peripheral weir (circumference = πD)
- V-notch weirs for flow distribution
Rectangular tanks:
- End weir across full width
- Adjustable weirs for level control
Sludge Collection
Radial tanks:
- Rotating scraper bridge (0.02-0.05 rpm)
- Sludge withdrawn continuously or intermittently
- Scraper torque monitoring for density control
Rectangular tanks:
- Traveling bridge or chain-and-flight scrapers
- Hopper spacing: 3-5 m
- Sludge pumping cycles: 15-30 min intervals
Common Design Issues
Insufficient N-1 Capacity
Problem: Works designed with 2 tanks barely meeting criteria with both in service.
Solution: Size for N-1 from the outset. With 2 tanks, each must handle full DWF within limits.
High Weir Loading
Problem: Excessive weir overflow causing solids carryover.
Solution:
- Increase weir length (use radial peripheral weir)
- Add V-notch weirs for better distribution
- Consider adjustable weirs
Poor Sludge Density
Problem: Thin sludge (< 2% DS) causing excessive volumes.
Solution:
- Increase scraper frequency
- Add sludge blanket monitoring
- Consider pre-thickening
- Check for septicity (add Fe for odor control)
Septicity and Odor
Problem: Anaerobic conditions in sludge causing H₂S.
Solution:
- Reduce HRT if excessive (< 4 hours preferred)
- Add ferric chloride (dual benefit: P removal + H₂S control)
- Frequent sludge withdrawal
- Consider covered tanks with odor treatment
Related Calculations
- Flow and Load: Influent flow and load determination
- Chemical Dosing: Fe/Al dosing for enhanced P removal
- Sludge Production: Primary sludge handling and storage
References
- UK Sewers for Adoption (7th Edition): Appendix PS208 - Primary Sedimentation Tanks
- UK operator Design Standards: Primary treatment design criteria
- CIWEM/WaPUG: Urban wastewater treatment design guidance