HAZOP, LOPA, SIL, FMEA and DSEAR, run against your P&ID
The actions are tracked on the asset afterwards, with an owner and a due date.
Try it with a sample plant- HAZOPstudy report (PDF) · worksheet (CSV or XLSX)
- LOPAstudy report (PDF)
- SILassessment report (PDF)
- FMEAworksheet report (PDF) · worksheet (CSV or XLSX)
- DSEARassessment — held in the tool; no export yet
Included from the Professional plan.
Book a demoWhat this replaces
Day one of the workshop goes on rebuilding the node list, because last time it lived in someone’s spreadsheet
The study is filed as a PDF and the plant carries on changing without it
The actions end up in a second spreadsheet, and chasing them is somebody’s Friday
How it works
What you get out
- HAZOP study report (PDF)
- HAZOP worksheet (CSV or XLSX)
- Action register (PDF, CSV or XLSX)
- LOPA study report (PDF)
- SIL assessment report (PDF)
- FMEA worksheet report (PDF)
- FMEA worksheet (CSV or XLSX)
- DSEAR assessment — held in the tool; no export yet
These studies are facilitated, never certified. Deviations proposed by the tool are suggestions for the team to accept or reject, and every study requires a competent facilitator and a competent assessor to be worth anything.
What it is built to
- IEC 61882 — the guideword set and the 5×5 risk matrix the HAZOP worksheet works to
- IEC 61511 Annex F / CCPS — the LOPA frequency arithmetic, with an independence gate on each protection layer
- IEC 61508-6 — SIL verification by the simplified low-demand PFDavg equations
- IEC 60079-10-1 and DSEAR 2002 — zone classification, by a simplified scheme: a flashpoint flammability gate and a release-grade to zone-type mapping
- AIAG-VDA — the FMEA worksheet carries an action priority alongside the risk priority number
- Every study is facilitated by the tool and owned by you. Nothing here is a certification, and none of it replaces a competent facilitator or a functional-safety assessor.
Technical capabilities
Questions people actually ask
Does it generate the HAZOP from my P&ID?
No, and that is the honest answer to the question this page gets asked most. You define the nodes; the tool proposes deviations against the guidewords for the equipment it recognises, keeps the worksheet, the risk scoring and the actions, and produces the report. The node list is yours.
Which of the five do I get on my plan?
All five — HAZOP, LOPA, SIL, FMEA and DSEAR — from the Professional plan upwards. Starter includes none of them.
Is the SIL calculation certified?
No. It implements the simplified low-demand PFDavg equations from IEC 61508-6, and it shows you the inputs it used. A SIL verification that carries weight is signed by a competent functional-safety assessor, and this is a tool they use, not a substitute for them.
What comes out of a DSEAR assessment?
A stored, editable assessment with the substance properties, the flammability decision and the zone classification. There is no PDF or spreadsheet export for DSEAR yet — the other four studies all have one.
What happens when the design changes?
The study does not re-run itself, and there is no revision-to-revision diff. What you get is the study, its actions and its audit trail in the same place as the model, so a re-validation starts from the last study rather than from a blank page.
Who chases the actions?
A scheduled job does, against the due date and the owner on each action. It emails, provided your organisation has notifications switched on and an email provider configured, and it does not close anything on your behalf.